Carrier 38QHP009E8S Скачать руководство пользователя страница 2

02

01

CONTENTS

The manufacturer reserves the right to change any product specifications without notice.

Correct Disposal of This Product

(Waste Electrical & Electronic Equipment)

(When using air conditioner in European, the following guidance must be followed) 
- This marking shown on the product or its literature, indicates that waste electrical and 
  eletrical equipment (WEEE as in directive 2012/19/EC) should not be mixed with general 
  household waste.It is prohibited to dispose of this appliance in domestic household waste.
  For disposal, there are several possibilities:
1.The municipality has established collection systems, where electronic waste can be 
   disposed of at least free  of charge to the user.
2.When buying a new product, retailer will take back the old product at least free of charge.
3.The manufacturer will take back the old appliance for disposal at least free of charge to the
   user.
4. As old products contain valuable resources, they can be sold to scrap metal dealers.
  Wild disposal of waste in forests and landscapes endangers your health when hazardous 
  substances leak into the ground-water and find their way into the food chain.

 

This product contains fluorinated gases covered by the Kyoto Protocol 

Chemical Name of Gas
Global Warming Potential (GWP) of Gas

R32
675

CAUTION

1. Paste the enclosed refrigerant label adjacent to the 

    charging and/or recovering location.

2. Clearly write the charged refrigerant quantity on the 

    refrigerant label using indelible ink.

3. Prevent emission of the contained fluorinated gas. 

    Ensure that the fluorinated gas is never vented to 

    the atmosphere during installation, service or disposal. 

    When any leakage of the contained fluorinated gas is 

    detected, the leak shall be stopped and repaired as 

    soon as possible.

4. Only qualified service personnel are allowed to access 

    and service this product.

5. Any handling of the fluorinated gas in this product, 

    such as when moving the product or recharging the 

    gas, shall comply under (EC) Regulation No. 517/2014 

    on certain fluorinated greenhouse gases and any 

    relevant local legislation.

6. If the system has a leak-detection system installed, it 

    must be checked for leaks at least every 12 months

7. When the unit is checked for leaks, proper record-

    keeping of all checks is strongly recommended.

3
3
5
6
7
7
8
9
9
9
10
10
10
11
11
11
12
12
12
13
14
14
14
14
15

1. PREPARING FOR INSTALLATION

 

····································································

      1.1 Safety Percautions

 

·······················································································

      1.2 Accessories

 

·······························································································

      1.3 Installation Site Choosing

 

···············································································

2. INDOOR UNIT INSTALLATION

 

·········································································

      2.1 Indoor Unit Mounting Plate

 

··············································································

      2.2 Installation Process

 

······················································································

3. OUTDOOR UNIT INSTALLATION     ····································································

      3.1 Outdoor Unit Mounting Dimension

 

····································································

      3.2 Space Requirement For Outdoor Unit

    ·································································

      3.3 Outdoor Wire Connection

      ··············································································

      3.4 Install The Outdoor Unit

      ···············································································

      3.5 Install The Drain Pipe For Outdoor Unit

 

·······························································

4. REFRIGERANT PIPING WORK

 

········································································

      4.1 Flaring 

 

····································································································

      4.2 Piping Work

 

·······························································································

      4.3 Refrigerant Pipe 

 

·························································································

      4.4 Air Evacuation 

 

 ··························································································

      4.5 Leakage Test       

····························································································

5. WIRING

 

········································································································

6. FINAL CHECK AND TRAIL OPERATION

 

··························································

      6.1 Final Check List

 

··························································································

      6.2 Manual Operation

 

························································································

      6.3 Trail Operation

 

····························································································

7. INFORMATION SERVICING

 

·············································································

READ BEFORE INSTALLATION

This product has been determined to be in compliance with the Low Voltage Directive 

(2014/35/EU), and the Electromagnetic Compatibility Directive (2014/30/EU) of the 

European Union.

Caution:

 Risk of fire

for R32/R290 refrigerant only

42QHP012E8S*

42QHP009E8S*

Indoor Unit

Outdoor Unit

Rated Voltage & Hz

38QHP012E8S*

220-240V~

,

 50Hz

38QHP009E8S*

GB

Содержание 38QHP009E8S

Страница 1: ...96300 IMROPTANT NOTE Read this manual carefully before installing or operating your new air conditioning unit Make sure to save this manual for future reference Please check the applicable models F GA...

Страница 2: ...vented to the atmosphere during installation service or disposal When any leakage of the contained fluorinated gas is detected the leak shall be stopped and repaired as soon as possible 4 Only qualifi...

Страница 3: ...uld cause severe injury or death Disconnect from power source before attempting any electrical work Connect the connective cable correctly Wrongly connecting may result in electric parts damaged Use t...

Страница 4: ...sed to strong winds it is recommended that a wind baffle be used A location which can bear the weight of outdoor unit and where the outdoor unit can be mounted in a level position A location which pro...

Страница 5: ...a rise Step 7 Wrap Pipe and Cable Step 8 Hang the Indoor Unit 1 Run refrigerant lines through hole in the wall 2 Hang indoor unit on upper hook of mounting plate then push lower part of indoor unit u...

Страница 6: ...le of outdoor unit and rotate 90 degree to securely assemble them 3 5 INSTALL THE DRAIN PIPE FOR OUTDOOR UNIT unit cm unit cm Base pan hole of outdoor unit Drain hose Field supply Gasket Drain Outlet...

Страница 7: ...ign the center to tighten the flare nut and finish connection using two wrenches Flare nut Wrench Torque wrench 4 2 2 Select the appropriate insulation material for refrigerant pipe Min 10mm thermal i...

Страница 8: ...0mA is advisable This appliance incorporates an earth connection for functional purposes only CAUTION NOTICE 1 All power wires must be sized in according with national state and local electrical wirin...

Страница 9: ...n under a controlled procedure so as to minimise the risk of a flammable gas or vapour being present while the work is being performed 7 3 GENERAL WORK AREA All mintenance staff and others working in...

Страница 10: ...hat can be worked on while live in the presence of a flammable atmosphere The test apparatus shall be at the correct rating Replace components only with parts specified by the manufacturer Other parts...

Страница 11: ...t stating the equipment contains flammable refrigerant 20 19 7 19 RECOVERY CAUTION When removing refrigerant from a system either for service or decommissioning it is recommended good practice that al...

Страница 12: ...WEEE 2012 19 E 1 2 3 4 1 3 1 1 3 1 2 5 1 3 6 2 7 2 1 7 2 2 8 3 9 3 1 9 3 2 9 3 3 10 3 4 10 3 5 10 4 11 4 1 11 4 2 11 4 3 12 4 4 12 4 5 12 5 13 6 14 6 1 14 6 2 14 6 3 14 7 15 R32 R290 02 42QHP009E8S 3...

Страница 13: ...1 1 1 03 R410A 1 R32 4 m2 4 m2 R290 9000 Btu h 13m2 9000Bth h 12000Btu h 17m2 12000Btu h 18000Btu h 26m2 18000Btu h 24000Btu h 35m2 04 BG...

Страница 14: ...1 05 1 06 15cm 30cm 2 3m 200cm 60cm 30cm 60cm 12cm 12cm 1 2 3 1 1 2 1 1 1 B 2 5 1 A 5 N 1 3 2 3 m BG...

Страница 15: ...07 2 2 1 65 65 mm 5 mm 2 2 A 65 mm 90 mm 1 2 3 4 8 1 2 3 5 6 7 1 2 3 08 2 16 mm 5 8 in 90 mm 3 54 in BG...

Страница 16: ...3 3 3 4 M10 3 5 90 3 1 12mm mm mm W H D A B 38QHP009E8S 38QHP012E8S 800 554 333 515 340 3 2 09 3 cm cm H D A B 3 100 mm x 150 mm 10 100 mm x 150 mm 10 W BG...

Страница 17: ...2 4 2 1 6 35 mm 18 20 N m 9 52 mm 25 26 N m 12 7 mm 35 36 N m 15 88 mm 45 47 N m 19 05 mm 65 67 N m 4 2 2 10 mm C 27 C 80 120 C 11 4 10 m 5 8 m 10 cm 12 76 cmHg Lo Hi 4 1 R32 4 1 1 90 4 1 2 4 1 3 A mm...

Страница 18: ...QHP009 QHP012 13 5 1 5 3 mm 30mA E 1 2 H07RN F 3 4 T20A 250VAC adpot R32 GND 14 A A 38QHP009E8S 10 0 16 3 1 5 mm2 5 1 5 mm2 38QHP012E8S 13 0 20 3 1 5 mm2 5 1 5 mm2 GND 5 Y G 4 cm 4 cm BG...

Страница 19: ...15 7 7 1 7 2 7 3 7 4 7 5 7 6 7 7 7 8 16 6 1 6 2 24 C COOLING 30 OFF 6 3 COOLING ON OFF MODE TEMPERATURE FAN SPEED 6 3 BG...

Страница 20: ...17 7 7 12 7 13 7 14 25 7 15 18 7 7 9 7 10 10 1 10 2 7 11 BG...

Страница 21: ...19 7 20 7 19 7 20 1 2 3 4 5 7 7 16 7 17 80 7 18 BG...

Страница 22: ...i ni i elektronski otpad WEEE prema direktivi 2012 19 EZ ne smije mije ati s obi nim ku nim otpadom Ovaj ure aj ne smije se odlagati u ku ni otpad Postoji nekoliko mogu nosti za odlaganje 1 Op ina je...

Страница 23: ...cu uklanjanjem bilo koje sigurnosne za tite ili zaobila enjem sigurnosnih prekida a Elektri arski radovi moraju se izvesti u skladu s priru nikom za instalaciju dr avnim i lokalnim propisima za elektr...

Страница 24: ...i upravlja 1 Instalacijska plo a 1 Vijak B 2 Dibl 5 Mali filter 1 Vijak A 5 Magnetni prsten neke jedinice N U skladu sa stvarnom koli inom 1 3 IZBOR MJESTA INSTALACIJE Unutra nja jedinica mjesto koje...

Страница 25: ...iti cijelom du inom potpuno prohodan mora biti nagnut prema dole i izoliran cijelom du inom do vanjskog zida Ispravno Nemojte oblikovati uspon Nemojte stavljati kraj odvoda u vodu Korak 5 Priklju ite...

Страница 26: ...imenzije vanjske jedinice mm Dimenzije monta e mm Vanjska jedinica V D A B 38QHP009E8S 38QHP012E8S 800 554 333 515 340 3 2 POTREBAN PROSTOR ZA VANJSKU JEDINICU 09 3 INSTALACIJA VANJSKE JEDINICE Instal...

Страница 27: ...ili dr sli ne lokacije poja ajte izolaciju Temperatura otpornosti izolacije na toplotu treba biti vi a od 120 C Nanesite ljepilo na spojni dio izolacije da biste sprije ili ulazak vlage Popravite i p...

Страница 28: ...emljenje koje ovaj ure aj sadr i ima isklju ivo funkcionalnu svrhu NAPOMENA 1 Dimenzije svih elektri nih ica moraju biti u skladu s dr avnim i lokalnim propisima za elektroinstalacije Posebne zahtjeve...

Страница 29: ...iti i po mogu nosti izbaciti u atmosferu 7 8 PROVJERE RASHLADNE OPREME Sve zamjenske elektri ne komponente moraju odgovarati namjeni i specifikacijama U svakom trenutku treba slijediti proizvo a eve s...

Страница 30: ...lemljenje cijevi Uvjerite se da ispust vakuumske pumpe nije blizu izvora zapaljenja i da je omogu ena ventilacija 18 7 INFORMACIJE O SERVISIRANJU Veli ina punjenja je u skladu s veli inom prostorije u...

Страница 31: ...edstva za hla enje uslijed mehani kog o te enja opreme u ambala i Dozvoljeni maksimalni broj dijelova opreme koji se smiju pohraniti zajedno odre uju lokalni propisi 7 INFORMACIJE O SERVISIRANJU 7 16...

Страница 32: ...n OEEZ podle sm rnice 2012 19 ES nesm b t sm ch na s b n m komun ln m odpadem Likvidace tohoto za zen spole n s b n m komun ln m odpadem je zak z na Pro likvidaci existuje n kolik mo nost 1 Obec m zav...

Страница 33: ...avujte tuto jednotku t m e odstran te jakoukoliv bezpe nostn ochranu nebo p emost te jak koliv sp na bezpe nostn ho blokov n Elektroinstala n pr ce by m ly b t prov d ny v souladu s n vodem k instalac...

Страница 34: ...an V vod odtoku 1 Baterie 2 T sn n 1 Dr k d lkov ho ovlada e 1 Mont n deska 1 roub B 2 Kotva 5 Mal filtr 1 roub A 5 Magnetick krou ek n kter jednotky N v z vislosti od skute n ho mno stv 1 3 V B R M S...

Страница 35: ...n n m roub demontujte kabelovou svorku 3 Prot hn te p ipojovac vodi e ze zadn strany vnit n jednotky a p ipojte je ke svorkovnici vnit n jednotky Odtok Odtokov potrub nesm b t v dn m m st sv d lky zab...

Страница 36: ...r hlavy upev ovac ho roubu by m l b t v ce ne 12 mm Rozm ry venkovn jednotky mm Mont n rozm ry mm Venkovn jednotka W H D A B 38QHP009E8S 38QHP012E8S 800 554 333 515 340 3 2 PROSTOROV PO ADAVKY VENKOV...

Страница 37: ...hyn a podobn ch m st zesilte izolaci Teplota tepeln ho odporu izolace by m la b t vy ne 120 C Pou ijte lepidla na spojovac sou sti izolace abyste p ede li vniknut vlhkosti Opravte a zakryjte p padn pr...

Страница 38: ...A Tento spot ebi zahrnuje zemnic p pojku pouze pro el funk nosti UPOZORN N 1 V echny nap jec vodi e mus b t dimenzov ny v souladu s n rodn mi st tn mi a m stn mi elektroinstala n mi p edpisy V p pad z...

Страница 39: ...prov d n m jak koliv innosti za p tomnosti vysok teploty dostate n odv tr v na Nep etr it odv tr v n mus b t zaji t no po celou dobu prov d n pr ce Odv tr v n mus bezpe n rozptylovat ve ker uvoln n ch...

Страница 40: ...adice v v vy nenach z v bl zkosti dn ch zdroj vzn cen a e je zaji t no odv tr v n 18 7 INFORMACE PRO PROV D N SERVISN CH Z SAH plnic objem odpov d velikosti m stnosti ve kter jsou um st ny sou sti obs...

Страница 41: ...ho po kozen za zen uvnit balen Maxim ln po et kus za zen kter je dovoleno skladovat spole n bude stanoveno m stn mi p edpisy 7 INFORMACE PRO PROV D N SERVISN CH Z SAH 7 16 POSTUPY PLN N Krom konven n...

Страница 42: ...30 2012 19 1 2 3 4 1 3 1 1 3 1 2 5 1 3 6 2 7 2 1 7 2 2 8 3 9 3 1 9 3 2 9 3 3 10 3 4 10 3 5 10 4 11 4 1 11 4 2 11 4 3 12 4 4 12 4 5 12 5 13 6 14 6 1 14 6 2 14 6 3 14 7 15 R32 R290 02 Hz 42QHP009E8S 38Q...

Страница 43: ...1 1 1 03 R410A 1 R32 4 m2 4 m2 R290 9000 Btu h 13 m2 9000 Bth h 12000 Btu h 17m2 12000 Btu h 18000 Btu h 26m2 18000 Btu h 24000 Btu h 35m2 04 EL...

Страница 44: ...1 05 1 06 15cm 30cm 2 3m 200cm 60cm 30cm 60cm 12cm 12cm A 1 2 3 1 Mode Timer TurboI ON LED ON OFF Fan Follow me Self clean 1 2 1 1 1 2 5 1 5 N 1 3 2 3 m EL...

Страница 45: ...895 435 435 5 217 460 242 5 45 150 258 65 232 5 45 45 65 298 16 mm 5 8 90 mm 3 54 A 65 mm 90 mm 07 2 2 1 5 mm 2 2 1 2 3 4 8 1 2 3 5 6 7 1 2 3 08 2 EL...

Страница 46: ...3 3 3 4 M10 3 5 90 3 1 12mm mm mm A B 38QHP009E8S 38QHP012E8S 800 554 333 515 340 3 2 09 3 cm cm A B 3 100mm x 150mm M10 100mm x 150mm 10 EL...

Страница 47: ...19 05 mm 23 3 22 9 4 1 4 4 3 6 35 mm 9 52mm R32 3 m 5 m 12 g 24 g R32 5 5m R32 Inverter m m 9K 12K 25 10 R32 4 4 76cmHg 4 5 HFC A B 4 2 4 2 1 6 35 mm 18 20 N m 9 52 mm 25 26 N m 12 7 mm 35 36 N m 15...

Страница 48: ...QHP009 QHP012 13 5 1 5 3 mm RCD 30 mA 1 2 H07RN F 3 4 T20A 250 V AC R32 14 A 38QHP009E8S 10 0 16 3 1 5 mm2 5 1 5 mm2 38QHP012E8S 13 0 20 3 1 5 mm2 5 1 5 mm2 5 4 cm 4 cm EL...

Страница 49: ...15 7 7 1 7 2 7 3 7 4 7 5 CO2 7 6 7 7 7 8 16 6 1 6 2 24 C 30 6 3 COOLING ON OFF MODE TEMPERATURE FAN SPEED E E 6 3 EL...

Страница 50: ...17 7 7 12 7 13 7 14 LFL 25 OFN 7 15 OFN OFN OFN 18 7 7 9 7 10 10 1 10 2 7 11 EL...

Страница 51: ...19 7 20 7 19 7 20 1 2 3 4 5 7 7 16 OFN 7 17 80 7 18 EL...

Отзывы: