
60
Steps
Procedure
7.
Remove
cabinet
Remove the screws connecting the panel with the
chassis,the motor support and Clapboard Assy then
remove the cabinet.
Remove the grounding wire screw on the control
box assy and then remove the grounding wire.
D i s c o n n e c t t h e w i r i n g t e r m i n a l s o f r e a c t o r,
c o m p r e s s o r, h i g h a n d l o w p r e s s u r e s w i t c h ,
compressor overload protector, temperature sensor,
outdoor fan motor and 4-way valve.
Note: keep pressing the circlip when disconnecting
the wiring terminal of reactor; keep pressing the
retainer when disconnecting other wiring terminals.
Remove the wire inside the wiring groove.
Remove the 2 screws retaining the control box assy
and then lift the control box assy upwards to remove
it.
Remove the nut retaining the fan blade and then
remove the fan blade.
Remove the screws retaining the motor and then
remove the motor.
Remove the screws retaining the motor support and
then remove the motor support.
Remove the 4 screws connecting the reactor and
isolation plate, and then remove the reactor.
8.Remove control box assy
Motor Support
Reactor
Motor
Control box assy
Cabinet
9.Remove fan blade, motor, motor support and reactor
Fan Blade
Содержание 38GVM Series
Страница 14: ...14 WIRING DIAGRAMS A13093 Fig 12 38GVM 18k Wiring Diagram...
Страница 15: ...15 WIRING DIAGRAMS CONTINUED A13094 Fig 13 38GVM 24k Wiring Diagram...
Страница 16: ...16 WIRING DIAGRAMS CONTINUED A13095 Fig 14 38GVM 30k Wiring Diagram...
Страница 17: ...17 WIRING DIAGRAMS CONTINUED A13096 Fig 15 38GVM 36k Wiring Diagram...
Страница 18: ...18 WIRING DIAGRAMS CONTINUED A13097 Fig 16 38GVM 42k Wiring Diagram...