3-4-3. Stop operation
1. Local operation mode
(1) Keep pressing "Stop" key on the
operation board of the chiller for
more than a second.
(2) Make sure that “Run” indication lamp
goes off and "Stop" indication lamp lights.
Fig.3-7 Operation board
2. Remote operation mode
(1) Turn on the stop switch on the remote control panel of field supply.
(2) Another way to stop the chiller is to press "Stop" key on the operation board of the
chiller during remote operation.
NOTE : If the chilled water pump, cooling water pump, and Chiller are interlocked,
each pump stops automatically when the Chiller stops.
If otherwise, please stop them in the following sequence:
1) The Chiller 2) Cooling water pump 3) Chilled water pump
The air handling unit must be stopped
after the chilled water pump is stopped
.
Stop key
25
Содержание 16LJ-01
Страница 1: ...Absorption Chiller OPERATION MANUAL 16LJ 01 02 03 Original instructions ...
Страница 13: ...9 2 2 CONTROL PANEL Fig 2 3 CONTROL PANEL Fig 2 4 CONTROL PANEL inside ...
Страница 14: ...10 Fig 2 5 POWER BOX Fig 2 6 POWER BOX inside TERMINAL BASE CIRCUIT BREAKER MAGNET SWITCH OVERCURRENT RELAY ...
Страница 15: ...11 Fig 2 7 OPERATION BOARD ...
Страница 18: ...14 Fig 2 8 FLOW DIAGRAM ...
Страница 24: ...Fig 3 3 SW3 backup switch and backup battery SW3 Backup switch UP ON DOWN OFF Backup switch 20 ...
Страница 51: ...47 ...