
38
6 MAINTENANCE
6.1 Maintenance carried out by the user
AFTER THE FIRST HOUR OF USE
•
Check the tightness of the tines and ploughshares.
BEFORE EACH DAY OF WORK
IMPORTANT: Check the wear of the tine ploughshares, invert or change
those as required.
•
The wheel roller bearings are maintenance free, just check their condition.
•
IMPORTANT: Check the recommended tyre pressure at 2.25 bars for the
wheels on the central portion and 7 bars for the wheels on the
extensions.
ONCE A YEAR, AFTER EACH SEASON
•
Replace worn ploughshares, as well as the tines which are showing signs of
fatigue (lengthening, cracks, etc.)
•
The bearings on the depth adjustment wheels are lubricated for life, check the
set of hubs by hand.
•
Inspect the articulation rings on the equipment. They must be replaced if worn.
•
Inspect the articulation rings on the Chisel tines.
•
Check for the good condition of the rubber tyre wheel bearings, the absence of
excessive play and the proper tightening of the rings.
•
Spare parts as requested. Consult the corresponding nomenclatures. Spare
parts must meet the manufacturer's technical requirements, which is always the
case with original parts.
•
Check belt tension.
•
Clean the cells on the dispenser.
•
Remove the distribution head cover then blow air on the descents.
STORAGE BETWEEN 2 CROP YEARS
•
After cleaning with a spray of water or high-pressure hose, all of the points that
can be removed should be oiled or greased.
•
Store the device on stable ground.
6.2 Maintenance carried out by specialised personnel
The PENTASEM does not require the use of any special tools for maintenance. This
can therefore be accomplished entirely by the user.
Do not clean the electrical box with a high-pressure hose.
Содержание PENTASEM Series
Страница 2: ......
Страница 44: ...43 Notes...