7310 Series Operations Manual
REV E 11-19-19
Page 72 of 131
press the
(Continue to profile) button. This will allow you to go to the next
profile and set up the next number of steps. The numeric value shown will change based
on the next available profile.
When finished creating of the required steps, press the
(Ramp Soak) button
to go back to Ramp Soak Profile screen.
The black arrow indicates that after first profile 1 (1-10) is finished it will continue on to
profile 2 (11-20).
This example screen is showing all 5 profiles are being utilized, up to 50 steps.
Continue to
next Profile
icon
Содержание 7310-22
Страница 1: ......
Страница 115: ...7310 Series Operations Manual REV E 11 19 19 Page 115 of 131 ELECTRICAL SCHEMATICS ...
Страница 116: ...7310 Series Operations Manual REV E 11 19 19 Page 116 of 131 ...
Страница 117: ...7310 Series Operations Manual REV E 11 19 19 Page 117 of 131 ...
Страница 118: ...7310 Series Operations Manual REV E 11 19 19 Page 118 of 131 ...
Страница 119: ...7310 Series Operations Manual REV E 11 19 19 Page 119 of 131 ...
Страница 120: ...7310 Series Operations Manual REV E 11 19 19 Page 120 of 131 ...
Страница 121: ...7310 Series Operations Manual REV E 11 19 19 Page 121 of 131 ...
Страница 122: ...7310 Series Operations Manual REV E 11 19 19 Page 122 of 131 ...
Страница 123: ...7310 Series Operations Manual REV E 11 19 19 Page 123 of 131 ...
Страница 124: ...7310 Series Operations Manual REV E 11 19 19 Page 124 of 131 ...