7310 Series Operations Manual
REV E 11-19-19
Page 17 of 131
Led lights should only be used in a non-condensing
environment.
Connecting the Led Lighting
Plant Growth Chambers with LED lighting have light banks consisting of 2, 9 or 24 LED
clusters on each bank. The LED banks are suspended under each shelf. The light banks
are shipped fully installed in place and wired from the factory. See the Operations or
Maintenance sections of the manual for more details.
Model 7312-22 shown with LGHT329 option
Other models may vary
Содержание 7310-22
Страница 1: ......
Страница 115: ...7310 Series Operations Manual REV E 11 19 19 Page 115 of 131 ELECTRICAL SCHEMATICS ...
Страница 116: ...7310 Series Operations Manual REV E 11 19 19 Page 116 of 131 ...
Страница 117: ...7310 Series Operations Manual REV E 11 19 19 Page 117 of 131 ...
Страница 118: ...7310 Series Operations Manual REV E 11 19 19 Page 118 of 131 ...
Страница 119: ...7310 Series Operations Manual REV E 11 19 19 Page 119 of 131 ...
Страница 120: ...7310 Series Operations Manual REV E 11 19 19 Page 120 of 131 ...
Страница 121: ...7310 Series Operations Manual REV E 11 19 19 Page 121 of 131 ...
Страница 122: ...7310 Series Operations Manual REV E 11 19 19 Page 122 of 131 ...
Страница 123: ...7310 Series Operations Manual REV E 11 19 19 Page 123 of 131 ...
Страница 124: ...7310 Series Operations Manual REV E 11 19 19 Page 124 of 131 ...