14
ENG
“
kit OEM KEC
” +030222160 - rel. 1.0 - 03/11/2015
2.8 Wiring diagram
L3
L
N
PE
L
N
PE
NO4
G0A
G0A
NO3
NO2
GOA
NO1
GOA
NO5
G0A
NO6
G0A
P out
P gnd
P +5v
F +Vdc
F gnd
F out
T gnd
T out
W
V
PE
U
F1
FROM CONTROLLER
A
PE
PE
W
V
U
L2
L1
M 3~
W
V
U
G
N
N L
L
PE
PE
F2
F3
FieldBus CARD
J26
J25
J5
J4
J3
J2
J24
J1
BMS CARD
J15
J14
J13
J11
J12
J10
KEC
Fig. 2.i
2.9 Checking motor rotation
When starting the unit for the first time, check correct direction of motor
rotation to ensure production of pressurised water; if rotation is in the
opposite direction, no pressurised water will be produced. Check through
the hole on the elastic joint socket that the motor rotates in the direction
indicated by the arrow shown on the socket.
Opening for checking direction of motor rotation
Fig. 2.j
Note
: when the pump starts and during the transient when
opening step 2, until the pressure reaches around 2-3 bars, the
pump may sound noisy. This is completely normal for a rotary vane pump
and is not due to cavitation.e.