docs.carbide3d.com
8/26/2020
Version 1.0
23
Install the Drag Chain
Install the Drag Chain to the X-
and Y1-Rails
Z-Plus Upgrade Kit:
Item
Description
Qty
W
M3
×
4mm Flat Head Screw
6
1.
Position the X-rail to the back of the machine.
2.
Lay the drag chain on the rails. See
Fig. 26
.
a.
First, place the three cables not
threaded through the X-Axis drag chain
(the Y-Axis proximity switch cable and
the Y1- and Y2-motor leads) over and
behind the X-rail
b.
Second, lift the drag chain and place it
across the Y1- and X-rails.
c.
Lay the drag chains so that the tail of
the Y-Axis drag chain will curl under and
the head of the X-Axis drag chain will
curl up.
Figure 26
Shapeoko 3 Machines:
Skip ahead to the “Install the Proximity Switches”
section on page 25.