![Carbide 3D Shapeoko Z-Plus Скачать руководство пользователя страница 11](http://html1.mh-extra.com/html/carbide-3d/shapeoko-z-plus/shapeoko-z-plus_assembly-manual_2555634011.webp)
docs.carbide3d.com
8/26/2020
Version 1.0
11
Part 2: Assembly & Installation
Assembly Tips
We recommend assembling as much of the Z-Plus as possible before installing it onto the Shapeoko; this process is
described in the steps below.
Get Familiar with the Z-Plus
1.
Take a minute to familiarize yourself with the front and back of the Z-Plus. See
Fig. 8
.
Figure 8
NOTE:
The application of a blue (i.e. light/medium grade) thread locker is at your discretion. We suggest adding
it post-assembly if any screws happen to work their way loose during use.