background image

 

 

[email protected] 

docs.carbide3d.com

 

 

05/01/20  

v1.1

 

 

Installation procedures differ for older and newer versions of Shapeoko XXL, XL, and 3. Models that shipped 
prior to the addition of the Z-Plus (our latest X/Z-axis carriage) in late 2019 require an upgrade to the Carbide 
Motion board, its enclosure cover, and the Y-axis right aluminum extrusion rail (Y2-rail).  

Models that shipped with the Z-Plus as standard equipment are ready for BitRunner right out of the box

no 

modifications needed. They come standard with an upgraded Carbide Motion board, enclosure cover, and a 
Y2-rail that is tapped and ready to mount the BitRunner with the included hardware. 

This guide will show you how to install BitRunner on both newer and older versions of the Shapeoko. If you 
run into any problems along the way, please send us an email at 

[email protected]

 and we will get 

you back on track. 

Install the BitRunner 

Attach BitRunner to Y2-Rail: Newer Models With Z-Plus 

The BitRunner attaches to the two M6 holes 
on the outside of the Y2-rail, with the switch 
and LED on TOP, and the power cords to the 
REAR. See 

Figure 2

1.

 

Use a 4mm hex key and the two (2) 
provided M6x12mm button head cap 
screws to secure the BitRunner to the 
Y2-rail as described above and shown 
in

 Figure 2

.  

New models include an upgraded Carbide 
Motion board and enclosure. You can jump 
directly to the Connect the Communications 
Cable section for instructions on how to 
connect the BitRunner to the Carbide Motion 
board. 

Attach BitRunner to Y2-Rail: 
Older Models (Pre-Z-Plus) 

Similar to the newer models, the BitRunner attaches to the outside of the Y2-rail with the switch and LED on 
TOP, and the power cords to the REAR. See 

Figure 2.

 There are two methods for attaching the BitRunner to 

the Y2-rail: taping or tapping. Choose the one that works best for you based on your comfort level and 
experience. 

Figure 2 

Содержание BitRunner

Страница 1: ...Kit Item Description Qty Note A BitRunner 1 BitRunner enclosure and attached power cords B Communications Cable 1 Gray 6 pin male to female extension cable C Mounting Hardware 2 M6 x 12mm button head...

Страница 2: ...t carbide3d com and we will get you back on track Install the BitRunner Attach BitRunner to Y2 Rail Newer Models With Z Plus The BitRunner attaches to the two M6 holes on the outside of the Y2 rail wi...

Страница 3: ...unting holes is 6 10 155mm 3 Use a 5mm drill bit for the tap hole and an M6 tap to form the threads Be sure to drill all the way through the outer wall of the extrusion and into the cavity 4 Use a 4mm...

Страница 4: ...rail 5 Use an SAE 3 32 inch hex key to remove the four 4 socket head cap screws in the corners of the Carbide Motion board The Carbide Motion board is taped to the enclosure and will need to be gentl...

Страница 5: ...board enclosure to the Y1 rail with the USB and power ports at the BACK and the 6 pin BitRunner connector at the FRONT 6 Reconnect the three 3 homing proximity switch cables and four 4 stepper motor e...

Страница 6: ...e an SAE 3 32 inch hex key and the four 4 existing socket head cap screws to secure the modified Carbide Motion board to the enclosure 4 Use a 4mm hex key and two 2 M6x12mm button head cap screws to a...

Страница 7: ...rom the Y2 rail See Figure 6 Make sure the plug is fully seated You will hear the latch click into place Connect the Female End to the Carbide Motion Board The FEMALE end of the communications cable c...

Страница 8: ...1 Left Forward Auto On Off the LED is green or red The G code or absence thereof determines when BitRunner cuts or supplies power to the router If there is no G code nc file being executed in Carbide...

Страница 9: ...d M6 Carbide Motion will pause the job cut power to the router and alert you that it s time to change the tool 2 For safety flip the power switch on the router to the OFF position and slide the power...

Отзывы: