Page 24
14
15
16
16
9
6
7
8
11
12
13
1
1 2” Upstream Piping
2 Isolation Ball Valve, Full Port, 2” NPT
3 Reducer, 2” x 1.25” NPT
4 Y-Strainer, 1.25” NPT
5 Upstream Pressure Gauge, 0-100 PSI
6 Pipe Union, 1.25” NPT
7 Electronic Motorized Valve, 1.25” NPT
8 Tee, 1.25 x 1.25 x 0.75” NPT
9 Inlet Pressure Gauge, 0-100 PSI
10 M300-60 Turbine Generator Assembly
11 90 Degree Elbow, 1.25” NPT
12 Pipe Union, 1.25” NPT
13 Tee, 1.25 x 1.25 x 0.75” NPT
14 Downstream Pressure Gauge, 0-100 PSI
15 Reducer, 2” x 1.25” NPT
16 Isolation Ball Valve, Full Port, 2” NPT
17 2” Downstream Piping
2
3
4
5
10
4.6 M300-60 Recommended System Layout
Содержание M300 Pico
Страница 1: ...M300 Pico Hydro System Installation Operations Maintenance Version 2 0 0 1 ...
Страница 2: ...Page 2 ...
Страница 4: ...Page 4 ...
Страница 6: ...Page 6 ...
Страница 8: ...Page 8 ...
Страница 16: ...Page 16 ...
Страница 17: ...Page 17 4 Equipment Installation ...
Страница 29: ...Page 29 5 System Operation ...
Страница 36: ...Page 36 ...
Страница 37: ...Page 37 6 Maintenance ...
Страница 39: ...Page 39 7 Appendix ...
Страница 48: ...Page 48 7 4 Equipment Drawings and Performance Curves ...