![Canyon Hydro M300 Pico Скачать руководство пользователя страница 7](http://html.mh-extra.com/html/canyon-hydro/m300-pico/m300-pico_installation-operation-and-maintenance_493999007.webp)
Page 7
2. Theory of Operation
The M300 Pico Hydro System generates power by recovering energy at water
network pressure drop locations. Water networks frequently use pressure
reduction valves (PRVs) to reduce water pressure for water delivery operations.
The Pico Hydro is installed in parallel with a pressure reduction valve and
generates electrical power from the pressure differential.
The M300 system works by diverting a small portion of the flow around the
PRV and into a hydroelectric turbine. Flow passes through the turbine and is
converted from hydraulic energy into electric energy.
Generated electricity is sent to the control panel which provides system
monitoring and control. The control panel intelligently distributes power to
connected devices and a battery bank. Charge level is monitored and power
generation is automatically matched to demand. Power output is regulated by
a motorized valve which precisely modulates generation.
The battery bank’s stored power allows for uninterrupted operation of the
connected devices in times of diminished water flow and permits short term high
power consumption periods such as surge loads.
RTU
Содержание M300 Pico
Страница 1: ...M300 Pico Hydro System Installation Operations Maintenance Version 2 0 0 1 ...
Страница 2: ...Page 2 ...
Страница 4: ...Page 4 ...
Страница 6: ...Page 6 ...
Страница 8: ...Page 8 ...
Страница 16: ...Page 16 ...
Страница 17: ...Page 17 4 Equipment Installation ...
Страница 29: ...Page 29 5 System Operation ...
Страница 36: ...Page 36 ...
Страница 37: ...Page 37 6 Maintenance ...
Страница 39: ...Page 39 7 Appendix ...
Страница 48: ...Page 48 7 4 Equipment Drawings and Performance Curves ...