Page 20
4.2.6 Pipe and Pipe Fittings
All piping to and from the system should be two inch diameter or larger. Pipe
between system components can be 1.25” permitted they are short lengths. For
all plumbing avoid sharp bends and long runs of pipe to reduce pressure losses.
Pressure losses through the piping can result in power loss from the generator
and must be accounted for.
The connections on the M300 turbines are NPT threaded connections, consult
the turbine-generator drawings for specifics.
4.2.7 Mounting Hardware
The M300 turbine-generator assembly and control panel should be securely
mounted in a location that will not be flooded and is protected from the
elements. Mounting dimensions can be found on the drawings located in the
appendix.
Содержание M300 Pico
Страница 1: ...M300 Pico Hydro System Installation Operations Maintenance Version 2 0 0 1 ...
Страница 2: ...Page 2 ...
Страница 4: ...Page 4 ...
Страница 6: ...Page 6 ...
Страница 8: ...Page 8 ...
Страница 16: ...Page 16 ...
Страница 17: ...Page 17 4 Equipment Installation ...
Страница 29: ...Page 29 5 System Operation ...
Страница 36: ...Page 36 ...
Страница 37: ...Page 37 6 Maintenance ...
Страница 39: ...Page 39 7 Appendix ...
Страница 48: ...Page 48 7 4 Equipment Drawings and Performance Curves ...