87
3. Turn the projector base up, and remove the two
adjusting legs on front side.
4. Install the attached M4 screws at the six screw fastening
positions on the Base bracket.
Caution:
■
Make sure to remove the adjusting foot before attaching
the screw to the front part of the projector.
■
Be sure to keep the removed adjusting foot safely for
later use.
5. Secure the terminal clamp of the Anti-fall wire with the
attached M4 screw at (A) on the Base bracket.
Make sure to fasten and tighten the screw securely.
A
6. Pull cables out of the cable hole in the ceiling.
■
As depicted in the diagram, let cables pass through
the hole on ceiling-mount clamp.
■
If cables are too thick, make a hole at a different
position than the hole on the ceiling-mount clamp,
and let them pass through the new hole.
7. Secure the ceiling-mount bracket using the four M5
screws removed during preparation.
Direction to the
screen
8. Hook the base bracket on the protrusion (A) of the joint
fitting, and secure it temporarily using the four supplied
M5 screws (B).
9. Mount the terminal clamp on the other end of anti-fall
wire to the Joint fitting (C), and secure it at the wire-
attaching position using M4 screw.
■
Pull out the cables.
■
Be sure to secure screws (B) tightly after making
A
C
B
B
10. Connect the cables to the projector.
After completion of installation, adjust the projection
angle (page
).