Chapter 3
3-28
3.3.1.2 Removing the Transfer Roller
0025-1239
LBP6000 / LBP6000B
1) Open the Delivery Auxiliary Tray [1] and the Delivery Tray [2].
2) While pushing the 2 claws [3], remove the Transfer Roller [4].
F-3-91
3.4 PICKUP AND FEEDING SYSTEM
3.4.1 Pickup Unit
3.4.1.1 Preparation for Removing the Pickup Unit
0019-4143
LBP3100 / LBP3010B
1) Removing the Upper Cover
Reference[Removing the Upper
Cover]
2) Removing the Left Cover
Reference[Removing the Left Cov-
er]
3) Removing the Right Cover
Reference[Removing the Right
Cover]
4) Removing the Rear Cover
Reference[Removing the Rear
Cover]
5) Removing the Main Controller PCB
Reference[Removing
the Main Controller PCB]
3.4.1.2 Removing the Pickup Unit
0019-4145
LBP3100 / LBP3010B
1) Remove the inner rear cover [1].
- 1 screw [2]
F-3-92
2) Remove the shaft support [1].
F-3-93
3) Remove the terminal [1] and free the harness [3] from the harness guide
[2].
- When disassembling/assembling, be sure not to touch the Transfer Roller
[1].
[1]
[1]
[2]
[1]
[4]
[3]
[1]
[2]
[1]
[1]
Содержание LBP6000 Series
Страница 1: ...Sep 8 2010 Service Manual LBP6000 6018 3010 3100 3150 Series...
Страница 2: ......
Страница 6: ......
Страница 12: ...Contents...
Страница 13: ...Chapter 1 PRODUCT DESCRIPTION...
Страница 14: ......
Страница 16: ......
Страница 28: ......
Страница 29: ...Chapter 2 TECHNICAL REFERENCE...
Страница 30: ......
Страница 74: ......
Страница 75: ...Chapter 3 DISASSEMBLY AND ASSEMBLY...
Страница 76: ......
Страница 119: ...Chapter 4 MAINTENANCE AND INSPECTION...
Страница 120: ......
Страница 122: ......
Страница 126: ......
Страница 127: ...Chapter 5 TROUBLESHOOTING...
Страница 128: ......
Страница 130: ......
Страница 137: ...Chapter 6 APPENDIX...
Страница 138: ......
Страница 140: ......
Страница 144: ......
Страница 145: ...Sep 8 2010...
Страница 146: ......