Chapter 1
15
1) Open the manual feed tray cover [1], remove the
screw [2] from the door tape, and fully open the
manual feed tray cover [1]
F-1-28
2) Remove the tape [1] and detach the hopper supply
mouth cover [2].
F-1-29
3) Take out the developing assembly from the packing
box.
4) Turn the developing cylinder gear with a hand, and
check to see if there is any breakage on the cylinder.
5) Holding the central part (the pocket for handle) of
the developing assembly [1], insert the assembly to
the machine, and inlet the connector [2].
When mounting the developing assembly, be aware to
keep the developing cylinder from contact with the
sheet metal of the developing assembly support.
F-1-30
6) Insert the right side (Rear) of the developer pressure
unit [2] in the package, and then insert the left side
(Front) keeping the unit in a horizontal position.
Fix the unit using the truss head screw (M4 x 6) [1]
in the package.
F-1-31
1.2.7
Installing the Pick-up
Assembly
0008-7967
iR5570 / iR6570
1) Remove the pick-up roller pressure release spacer
[1].
[1]
[2]
[2]
[1]
[1]
[2]
[1]
[2]
Содержание iR6570 series
Страница 1: ...Feb 21 2005 Installation Procedure iR6570 5570 Series...
Страница 2: ......
Страница 6: ......
Страница 9: ...Chapter 1 Installation Procedure...
Страница 60: ......
Страница 61: ...Feb 21 2005...
Страница 62: ......