7
7
7-21
7-21
Installation > Installation Procedure > Connecting with the High Capacity Stacker
Installation > Installation Procedure > Connecting with the High Capacity Stacker
11)
Install the Rear Cover. (8 Screws)
12)
Install the Rear Small Cover. (1 Screw)
13)
Install the Shunt Cable.
• 2 Screws (RS tightening; M4x10)
x2
F-7-57
Connecting with the High Capacity Stacker
NOTE:
Be sure the power of the host machine is turned OFF and the power plug is
disconnected from the outlet.
1) Remove the 3 Face Covers of the High Capacity Stacker left side.
(The removed covers and screws will not in use anymore.)
• 4 Screws
Screw
x4
Screw
F-7-58
Содержание Finisher-AK1
Страница 8: ... Notes Before Servicing Points to Note at Cleaning Safety Precautions ...
Страница 10: ...1 1 Product Outline Product Outline Product Specifications Names of Parts ...
Страница 55: ...3 3 Periodic Servicing Periodic Servicing User Maintenance Maintenance and Inspection ...
Страница 172: ...5 5 Adjustment Adjustment Basic Adjustment Adjustment at Time of Parts Replacement Auxiliary Adjustment ...
Страница 309: ...6 6 Troubleshooting Troubleshooting Upgrading ...
Страница 361: ... Service Tools Solvents and Oils List of Signals General Circuit Diagram Appendix ...