4
4
4-58
4-58
Parts Replacing and Cleaning > Intermediate Process Tray Assembly > Removing the Neat Stack Unit (Upper) > Procedure
Parts Replacing and Cleaning > Intermediate Process Tray Assembly > Removing the Neat Stack Unit (Upper) > Procedure
2) Set the Belt Retainer Shaft [1] released.
[1]
3) Turn the pulley [1] in the direction of the arrow to set the positions of the 2 ribs [A] as shown
in the figure below.
[1]
[A]
[A]
F-4-130
F-4-131
4) Remove the Timing Belt [2] from the pulley [1].
[1]
[2]
5) Remove the Neat Stack Unit (Upper) [1].
• 2 Connectors [2]
• 2 Screws [3]
• 2 Pins [4]
CAUTION:
When installing/removing the Neat Stack Unit (Upper) [1], be sure to install/remove the
screw [3] while supporting the Neat Stack Unit with your hand to prevent a fall.
x2
x2
[1]
[3]
[4]
[4]
[3]
[2]
F-4-132
F-4-133
Содержание Finisher-AK1
Страница 8: ... Notes Before Servicing Points to Note at Cleaning Safety Precautions ...
Страница 10: ...1 1 Product Outline Product Outline Product Specifications Names of Parts ...
Страница 55: ...3 3 Periodic Servicing Periodic Servicing User Maintenance Maintenance and Inspection ...
Страница 172: ...5 5 Adjustment Adjustment Basic Adjustment Adjustment at Time of Parts Replacement Auxiliary Adjustment ...
Страница 309: ...6 6 Troubleshooting Troubleshooting Upgrading ...
Страница 361: ... Service Tools Solvents and Oils List of Signals General Circuit Diagram Appendix ...