7
7
7-5
7-5
Installation > Unpacking
Installation > Unpacking
Unpacking
1) Take out the equipment from the package.
2) Take the included package out.
CAUTION:
To unpack the equipment, depends on the holding position, can cause the
transformation of the equipment, or even breakage.
Don't hold it by the transportation guide.
Transportation Guide
F-7-7
3) Remove the packing material on the top of this equipment and bring down the plastic
material to the bottom.
Packing Material
Plastic Material
4) Lift up one side to remove the packaging material at the bottom, move the plastic material
to one side and slowly bring the equipment down.
Packing Material
Plastic Material
F-7-8
F-7-9
Содержание Finisher-AK1
Страница 8: ... Notes Before Servicing Points to Note at Cleaning Safety Precautions ...
Страница 10: ...1 1 Product Outline Product Outline Product Specifications Names of Parts ...
Страница 55: ...3 3 Periodic Servicing Periodic Servicing User Maintenance Maintenance and Inspection ...
Страница 172: ...5 5 Adjustment Adjustment Basic Adjustment Adjustment at Time of Parts Replacement Auxiliary Adjustment ...
Страница 309: ...6 6 Troubleshooting Troubleshooting Upgrading ...
Страница 361: ... Service Tools Solvents and Oils List of Signals General Circuit Diagram Appendix ...