4
4
4-57
4-57
Parts Replacing and Cleaning > Intermediate Process Tray Assembly > Removing the Neat Stack Unit (Upper) > Procedure
Parts Replacing and Cleaning > Intermediate Process Tray Assembly > Removing the Neat Stack Unit (Upper) > Procedure
2) Open the Neat Paddle (Lower) Unit [1].
3) Move the belt [2] in the direction of the arrow so that the 2 claws [3] face upward.
NOTE:
If the 2 claws [3] are already facing upward, there is no need to move the belt [2].
[3]
[2]
[1]
4) Remove the 2 Neat Paddles (Lower) [1].
• 2 Claws [2]
x2
[1]
[1]
[2]
[2]
F-4-127
F-4-128
Removing the Neat Stack Unit (Upper)
■
Preparation
1) Remove the Stack Wall (Upper).(Refer to page 4-27)
■
Procedure
CAUTION:
When replacing or installing/removing the component parts of the Neat Stack Unit
(Upper), be sure to perform the following adjustment.
• Adjusting the Alignment Position of the Upper Neat Alignment Plate(Refer to page
1) Remove the Neat Stack Unit (Upper) Cover (Left) [1].
• 4 Screws [2]
[1]
[2]
[2]
x4
F-4-129
Содержание Finisher-AK1
Страница 8: ... Notes Before Servicing Points to Note at Cleaning Safety Precautions ...
Страница 10: ...1 1 Product Outline Product Outline Product Specifications Names of Parts ...
Страница 55: ...3 3 Periodic Servicing Periodic Servicing User Maintenance Maintenance and Inspection ...
Страница 172: ...5 5 Adjustment Adjustment Basic Adjustment Adjustment at Time of Parts Replacement Auxiliary Adjustment ...
Страница 309: ...6 6 Troubleshooting Troubleshooting Upgrading ...
Страница 361: ... Service Tools Solvents and Oils List of Signals General Circuit Diagram Appendix ...