LPDJH5811(5
#8832933#
Service Guide
LPDJH5811(5
#8832933#
Service Guide
REV. 1
August 1999 Page 11
Upgrading Network Multi-PDL Printer Board-F1
Since the Network Multi-PDL Printer Board-F1 system software requires a
large memory capacity, it will be provided in the form of a CD-ROM. This
upgrade is done in the same way as the main unit firmware upgrade; by
downloading the CD-ROM data from a PC to the printer extension board’s
HDD via a Bicentronics I/F.
In order to decrease the down time of the main unit, where efficient regular
service is possible, the number of sheets used for regular exchange
parts/consumable parts can be confirmed in service mode. Using the
main service mode, the technician can efficiently implement / prepare for
the exchange of parts and the next regular service.
The imageRUNNER 550/600 requires a 20 AMP outlet as well as a
NEMA 5-20R receptacle 20 ampere outlet (See Figure 1) for proper
operation. Confirm that a NEMA 5-20R receptacle is available prior
to installation.
CAUTION
DO NOT ATTEMPT TO PLUG THE imageRUNNER 550/600 COPIER
INTO A STANDARD NEMA 5-15R RECEPTACLE. DOING SO MAY
RESULT IN AN OVERLOAD TO THE ELECTRIC CIRCUITS OR
DAMAGE TO THE COPIER.
Figure 1
NEMA 5-20R Receptacle
(20 ampere)