Cannon FITZIB-SDSEB-NG Скачать руководство пользователя страница 15

10

1. This appliance is to be installed by an authorised service person only.

2. This appliance shall be installed in accordance with the manufacturer’s

installation instructions, local gas fitting regulations, municipal building

codes, electrical wiring regulations, and AS5601 the Australian Stand-

ard for gas installations. Refer also to AS5601 for pipe sizing tables.

3. Remove the heater from the carton and remove the three transit screws.

Check that the heater is suitable for gas available. Refer to the data

label located on fan chamber base, rear of lower front cover.

(Please dispose of packaging appropriately, keep away from children).

Clearances

4. Ensure the minimum clearances to combustible construction are main-

tained during installation, including adequate space for the proper

operation and servicing of the heater. For clearances to furniture and

curtains refer to warning on page 4.

For minimum clearances refer figures 10 and 11.

Note: Ensure that the combustion air opening under the heater

is not obstructed.

        

A CLEARANCE OF 50mm MUST BE MAINTAINED BETWEEN THE

REAR OF THE CABINET AND THE REAR WALL OF THE FIRE PLACE.

Fitment of cabinet depth spacer

The clearance is required for correct fluing of the appliance. If the

clearance is less than 50mm a cabinet depth spacer must be fitted. The

spacer can be ordered from the Cannon distributor. Order specifica-

tion for the spacer is ‘Fitzspacer”.

This is the requirement for installation into a masonry or brick fireplace

without flue connection.

Installation into a masonry/brick or mock fireplace.

5. Models FITZIB-SDSEB-NG & FITZIB-SDSEB-LP can be installed into a

masonry/brick fireplace or a mock fireplace. If installing into a mock

fireplace a mock fireplace installation kit MUST be used. The mock

fireplace kit can be ordered from the CANNON distributor. Order

specification for the part is ‘Mock kit”.

10

Installation instructions

11

15

13. Slide heater into the fireplace ensuring that gas inlet pipe is fed through

the hole at the rear bottom RHS of the heater. Refer figure 24 and gas

connection figure 26.

-

14. With heater in position, flanges should be hard against masonry. Se-

cure case flanges  to the masonry. Refer figure 25.

15. Connect incoming gas supply pipe to regulator. For inlet position see

figure 26. Close gate over gas supply and seal around the pipe with

fibreglass insulation material. Sealing is important as it prevents leak-

age from fan chamber into chimney: also check for gas soundness.

25

26

Gas connections

24

Содержание FITZIB-SDSEB-NG

Страница 1: ...NSTALLATION INSTRUCTIONS SERVICE INSTRUCTIONS Cannon This heater is approved for use with Natural and Propane gases Please leave instructions with the owner INBUILT MODELS FITZIB SDSEB NG FITZIB SDSEB...

Страница 2: ...nnected Installation WITHOUT a flue connected Sealing Gas connections 15 Log installation 16 Gas control 17 18 Gas pressure point Gas pressure adjustment Installation tips 19 Trouble shooting 20 21 Co...

Страница 3: ...with manufacturer s instruc tions this warranty may be void The customer must keep their Tax Invoice as proof of purchase of this product and compliance certificate as proof of required installation M...

Страница 4: ...e heater 4 Keep curtains clothing furniture and other flammable materials at least 900mm from front and sides of the heater At the owner s discretion curtain clearance can be less than 900mm as long a...

Страница 5: ...liances are present switch them on This is to test that there is no interaction between the Cannon heater and other appliances Refer AS5601 For air movement not to affect appliance see clause 5 3 1 Fo...

Страница 6: ...layout refer to figure 2 3 To turn heater on press switch to POWER ON position There is a 5 second delay before the burner ignites At this setting the burner is on LOW and the fan speed is on LOW Refe...

Страница 7: ...ting Refer figure 7 On low burner setting it is more efficient to operate the fan speed on LOW 8 If the burner fails to ignite wait 20 seconds and repeat the ignition procedure Refer figure 8 To turn...

Страница 8: ...pplier or authorised service person listed in this manual Flame characteristics The heater flame should be stable no lifting from the burner and the logs should glow after approximately 15 minutes ope...

Страница 9: ...speed Controller Electronic direct spark Power requirement 240 VAC 10 A Power consumption 90 VA maximum Minimum cavity Height 605mm dimensions dimensions Width 700mm Depth 393mm Optional Accessories...

Страница 10: ...niture and curtains refer to warning on page 4 For minimum clearances refer figures 10 and 11 Note Ensure that the combustion air opening under the heater is not obstructed A CLEARANCE OF 50mm MUST BE...

Страница 11: ...m air vents are unobstructed If an exhaust fan or other heating appliances are present switch them on This is to test that there is no interaction between the Cannon heater and other appliances Refer...

Страница 12: ...12 Installation WITHOUT a flue connected 13 14...

Страница 13: ...n is to be carried out only by a qualified electrician 7 Remove the lower front cover by unscrewing two M5 screws from the air intake slot Refer figure 16 If unit is fitted with supply flexible cord e...

Страница 14: ...s in top clamp and remove side clamps Refer figure 21 Sealing 12 All gaps between heater case and fireplace are to be sealed Seal with foam tape around top and sides of heater flange as required Refer...

Страница 15: ...tion flanges should be hard against masonry Se cure case flanges to the masonry Refer figure 25 15 Connect incoming gas supply pipe to regulator For inlet position see figure 26 Close gate over gas su...

Страница 16: ...on the burner head ensuring that the charring faces the front Refer fig ure 28 b Place log No 2 onto the 2 left back pins Refer figure 29 c Place log No 3 on single right front pin ensure fork locate...

Страница 17: ...e point is closed with a captive screw Turn screw 6 revo lutions anticlockwise to open the pressure point as indicated on figure 34 a and place manometer tube over the test point as per figure 34 b Ga...

Страница 18: ...y clockwise Replace plastic cap Ensure the little lug is positioned towards lower right hand side to clear the control 28 Refit the lower front cover making sure not to damage the power cord 29 Follow...

Страница 19: ...sary Install a chimney plate and cowl to the chimney opening using weath erproof mortar to common building practice Remove any curved firewall that slopes too far forward to the fireplace opening as i...

Страница 20: ...s maxi mum until the flame has been established Terminal 14 white wire into the 8 way switch connector will be energised as soon as the flame has been sensed 5 Confirm spark is produced A blue spark c...

Страница 21: ...will go into lockout if the flame current sensitivity is less than 0 5 micro amps The approximate signal strength on high flame is about 10 micro amps and on low 4 micro amps The signal strength will...

Страница 22: ...nition device needs to be removed to allow re moval of the gas control Remove LH screw from front lower section of ignition device Remove screw from front of rectifier lead located below domed cap on...

Страница 23: ...nergise dependant on room temperature The burner should now operate on high setting To replace the fan pressure switch 1 Remove the lower fan cover by unscrewing two M5 screws through the air intake s...

Страница 24: ...appliance or spare parts contact the CANNON distributor Sampford IXL 52 70 Sparks Avenue Fairfield Vic 3078 Phone 1300 727 421 Fax 1300 727 425 email service sampfordixl com au Wiring diagram Data pl...

Отзывы: