background image

 

 

CAMPO EQUIPMENT CO. LTD. (ECOBLAZE) 

6 Carson Court, Brampton, ON, CANADA, L6T 4P8 

Tel: (905) 793-2525 | Fax: (905) 793-8768 

www.campoequipment.com

  

pg. 8

 

 
Stopping Heater  

 

 

NOTE:

  if  the  heater  is  being  stopped  for  an 

extended period. 
  
1.  Turn manual inlet valve to OFF position.   
  
2. 

Place  Main  switch  to  “ON”  position  and 
Heat/

Fan switch to “FAN” position as well.  

  
3.  Allow  the  heater  to  cool  down  for  several 

minutes;  then  place  the  Main  switch  and 
Heat/

Fan switch to “OFF” position.  

  
4.  Turn  off  the  gas  supply  at  the  LP-Gas   

cylinder or gas main inlet when the heater 
is not in use.  

  

Extended Storage  

 

 

If the heater is to be shut down for an extended 

period, the fuel lines should be cleared from the 
primary  source  to  the  burner.    Clear  the  lines 
by (with the heater running) closing the valve at 
the primary source and allowing the heater to 
draw  the  pressure  out  of  the  lines.    Allow  the 
pressure  to  bleed  out  of  the  lines  until  the 
burner stops; then place the Main Switch in the 
“OFF”  position.  Close  all  manual  valves.  
Disconnect all power and fuel supply lines and 
cover all air and fuel line openings.   

  

CAUTION:  

Never close manual valves at the 

primary  source  and  heater  inlet  at  the  same 
time  unless  all  fuel  has  been  bled  out  of  the 
lines.    Fuel  trapped  between  the  primary 
source and the heater in the supply lines will be 
subjected  to  expansion  dependent  upon 
ambient  air  conditions.    Excessive  pressure 
build-up could occur in the supply line and lead 
to line failure.  Consult your local gas supplier 
for proper piping and gas codes.  
  

When storing the heater indoors the gas 

connection between the heater and the 
supply cylinder must be disconnected. 

 

 

 

Preparing After Extended Storage  

 

 

Several days or weeks before the heater will be 

used,  attention  should  be  paid  to  properly 
preparing  the  heater  for  service.    Since  the 
heater  is  an  important  element  of  your 
operation,  it  only  makes  sense  that  a  certain 
amount  of  time  is  necessary  to  prepare  the 
heater.  The  DF2500  should  be  inspected 
annually by qualified service personnel.  
  

 
 
WARNING  

Make sure the heater is de-energized before 
servicing.

  

  
1.  Check  the  igniter  for  corrosion,  damage, 

(cracked  insulator,  etc.),  and  proper 
separation.  Make sure that it is secure in 
the  burner.  Replace  any  igniter  beyond 
repair.   

  
2.  Check  the  burner  gas  ports  for  corrosion 

and 

any 

obstructions. 

(See 

burner 

Maintenance 

Section 

for 

cleaning 

instructions.)   

  
3.  Check the flame rod to be sure it is clean.  

Remove  any  scale  or  build-up  of  foreign 
matter.   

  
4.  Check for wax buildup in the manifold lines.   
  
5.  Check the wiring for broken wires or loose 

connections.    Tighten  or  replace  as 
necessary.    

  
6.  Check  the  entire  heater  for  any  visual 

damage.  Repair  or  replace  any  damaged 
components.   

  
7.  Check all unions and valves for leakage or 

damage.  Tighten or replace as necessary.   

  
8.  Do 

all 

items 

in 

the 

PRE-START 

CHECKLIST;  then  start  the  heater  to 
ensure proper operation.   

  

Содержание ECOBlaze DF2500

Страница 1: ...com pg 1 NG LP DIRECT FIRED SPACE HEATER BLAZE DF2500 WWW CAMPOEQUIPMENT COM REPORT 0367GH009S Installation Instructions Manual Maintenance Parts List CAUTION DO NOT TAMPER WITH HEATER OR ITS CONTROLS...

Страница 2: ...remain with the heater GENERAL HAZARD WARNING FAILURE TO COMPLY WITH THE PRE CAUTIONS AND INSTRUCTIONS PROVIDED WITH THIS HEATER CAN RESULT IN DEATH SERIOUS BODILY INJURY AND PROPERTY LOSS OR DAMAGE...

Страница 3: ...able to any subsequent owner The warranty period is one year from the date of purchase The warranty covers all defects in material and workmanship insofar as they are of Campo Equipment CO LTD manufac...

Страница 4: ...the material flash point Under no circumstance should any combustible material be stored in the airstream within 15 feet 4 57 m of the air discharge port or within 6 15 2cm of the top sides or ends of...

Страница 5: ...ter Use Sherlock 5 second leak of the proper temperature or soapy water on all connections to be sure they are tight Replace or tighten any connection as necessary The supply gas hose being used must...

Страница 6: ...Phase 208 to 240 V supply must be available INSTALLATION Single Phase Three Phase Up to 100 3 6 Up to 100 4 8 Up to 200 3 4 Up to 200 4 6 Up to 300 3 3 Up to 300 4 4 NOTE To power up the heater inside...

Страница 7: ...re is adequate 2 Check to make sure all manual valves are open between the fuel source and the burner 3 Check to make sure the proper voltage is supplied to the heater WARNING A qualified electrician...

Страница 8: ...ndent upon ambient air conditions Excessive pressure build up could occur in the supply line and lead to line failure Consult your local gas supplier for proper piping and gas codes When storing the h...

Страница 9: ...ch gas can pass through the modulator The more voltage that is applied to the magnet the more gas that can pass through The modulator is typically full open when a voltage of about 24 volts DC is appl...

Страница 10: ...f any mixing plates are loose or missing fasteners tighten replace as necessary Always use zinc plated or stainless fasteners 3 Observe flame pattern and if necessary take steps to correct obstructed...

Страница 11: ...The following is the method for testing major electrical components WARNING A qualified electrician should perform all tests replacements and adjustments Testing the Main Switch Before assuming the C...

Страница 12: ...he switch is functioning disconnect and insulate wires leading to the switch N O contacts Connect an ohmmeter or continuity light to the switch N O contacts Place the Heat Fan switch to FAN position T...

Страница 13: ...s power to the VFD Burner does not ignite 1 Voltage insufficient 1 Check incoming supply 2 Electrode disconnected adjusted incorrectly defective 2 Connect adjust replace electrode 3 Air Proving Sw Dis...

Страница 14: ...ctive 4 Replace Air Proving Sw 5 Flame rod dirty defective 5 Clean Replace Flame Rod 6 Inadequate fuel delivery 6 Fill Tank replace regulators valves check gas lines for obstructions TROUBLESHOOTING D...

Страница 15: ...CAMPO EQUIPMENT CO LTD ECOBLAZE 6 Carson Court Brampton ON CANADA L6T 4P8 Tel 905 793 2525 Fax 905 793 8768 www campoequipment com pg 15 WIRING DIAGRAM...

Страница 16: ...89 Digital Panel Mounted Voltmeter C70064 3 POSITION SWITCH C70069 FIXING COLLAR C70067 N O CONTACT BLOCK C80025 VFD C80023 R Fan C90025 Power On Indicator Light GREEN C90029 Outlet for Plug C70052 TI...

Страница 17: ...C82119 2 X21 2 NIPPLE C82120 2 X90 STREET ELBOW C82121 2 X11 2 REDUCER C82122 11 2 X6 NIPPLE C82123 11 2 X90 ELBOW C82124 11 2 X2 NIPPLE C82125 2 UNION C82126 1 4 X11 2 L NIPPLE C80913 1 4 NPT x 1 4...

Страница 18: ...ASSY C82191 PANEL C82192 PANEL C82193 ADAPTER PLATE C82194 R 560 FAN MOUNT ASSY C82195 CORNER STOP C82196 FAN SUPPORT BRACKET C82197 INSULATION BACK PANEL C82087 Serial Number variable data C82088 War...

Страница 19: ...P8 Tel 905 793 2525 Fax 905 793 8768 www campoequipment com pg 19 C82086 E 560 FAN MOUNT ASSY C82105 15 KVA TRANSFORMER C82106 60A CONTACTORS C50242 AUXILIARY CONTACTS C82042 VSR Relay C60205 Use With...

Отзывы: