
l
To avoid having the tower being blown into nearby power lines, do not install or remove
towers in moderate or heavy winds.
l
If it is necessary to use a ladder, choose a ladder made of non-conductive, non-metallic
materials.
l
Have someone present who has been trained in electric shock first aid, if possible.
2.3 Tower installation
l
Properly assemble the tower according to the instructions in this manual (do this in the
location the tower is to be installed).
l
Once the tower is in its full vertical position, securely fasten the tower to the base.
l
Ground the tower in accordance with all applicable local electrical codes.
l
Keep the bottom of the tower legs free of soil, ice, and debris to prevent trapping any
moisture inside or around the tower legs.
3. Initial inspection
3.1 Indoors
Immediately upon receipt of the tower:
l
Inspect the shipping cartons for visible damage. Report any damage to the shipping
company.
l
Open all shipping cartons.
l
Check the contents of the cartons against the invoice. Contact Campbell Scientific
immediately if any parts are missing.
3.2 Outdoors
l
Locate a suitable site for the tower (
l
Prepare the tower base (
(p. 9)).
o
Raise the tower (
UT6 and UT10 Universal Towers
2