
6. Check the tower for plumb using a level and adjust the leveling nuts below the mounting
feet on the J-bolts as required. When the tower is plumb, use two wrenches to lock the
lower nuts on each J-bolt together. Tighten the upper nuts to secure the base.
CAUTION:
Keep the bottom of the tower legs free of soil, ice, and debris to prevent trapping any
moisture inside or around the tower legs.
7. Removing the lower 3/8-inch bolt on the rear (West) leg allows the tower to be hinged to
the ground. If a step ladder is available, it is easier to leave the tower upright.
7.1.3 Ground rod
DANGER:
If any part of the weather station comes into contact with power lines, death or serious injury
could occur. Contact local utilities for the location of buried utility lines before digging or
driving ground rods.
Refer to the
section at the end of this manual prior to installing the ground rod. Ensure all
local electrical codes are followed by having electrical equipment and grounding installed by a
licensed electrician.
UT6 and UT10 Universal Towers
17