
Page
22
- Manual
- FA01940-EN
- 02/2023 © CAME S.p.A.
ALTERNATE OPERATION
The fi rst barrier opens, the vehicle passes, the fi rst barrier closes, the second barrier opens, the vehicle passes and the second barrier closes.
Electrical connections
Connect the two electronic boards with a UTP CAT 5 cable.
Fit an RSE card on both control boards using the RSE connector.
Connect up the electrics for the devices and accessories.
For information on connecting the electrics for the devices and accessories, please see the “ELECTRICAL CONNECTIONS” section.
The control and safety devices must be connected on both electronic boards.
Deactivate function F19 on the SLAVE operator control panel.
UTP CAT 5 (max 1000 m)
RSE
RSE