INSTALLATION
Remove the caps and remove the cover extruded. If you need to reduce the length of the profile cut, being
careful to avoid metal slag from falling onto electronic circuits. Drill the aluminum profile at two ends (for the
barriers longer may require additional holes, in which case it may be necessary to temporarily disconnect the
connection cable) and secure the profile to the wall.
Place the optics to the desired height by turning the screws on the circuit, make the connections to the terminal
blocks and seal the cable routing to prevent the entry of water and insects.
Make sure the screws are tight so that there is electrical contact between the board and the metal section that
acts as a screen to interference.
Select, activating dip switch, the number of pairs of bundles installed in the barrier.
N.B. Make sure that the expansions are properly connected (OUT>IN).
BEAM: move the ON DIPSWITCH up to the
corresponding number of expansions added to
the barrier. Failure to shift the DIPSWITCH
ON exclude the operation of its beam
Example 6 expansions added
AND
:
ON activates detection double-beam
(delay time 500 msec)
FAST
: single detection beam
(delay time 100 msec)
Fixing screw
LED SYNC
: indicates the operation of the
synchronism