FA00526-EN – ver. 3.3.1 – 12/2016
3
2.
MOUNTING
1. Remove devices from the pipe by applying pressure on the board to facilitate delivery;
2. Remove the caps and remove the cover extruded.
If you need to reduce the length of profile cutting and taking care to avoid metal slag from falling onto
electronic circuits;
3. Insert the sqaure gasket in the cap up to the square to match;
4. Insert the cable gland gasket into the groove;
5. Cutting the cable gland gasket to the desidered height;
6. Insert the cap in the aluminum profile to match up to the gasket with the metal;