Pa
g
e
33
-
M
an
u
al
C
od
e:
11
9
G
F8
8
E
N
11
9
G
F8
8
E
N
ve
r.
33
1
0
/2
0
14
© C
A
M
E
c
an
ce
lli
auto
m
ati
ci
s.p.a. - T
h
e d
ata a
n
d i
n
fo
rm
ati
on p
rovi
d
ed
in
th
is
m
an
u
al
a
re s
u
b
je
ct to c
h
an
g
e at a
ny ti
m
e w
ith
ou
t p
ri
or n
oti
ce
by C
A
M
E
C
an
ce
lli
A
u
to
m
ati
ci
S
.p.a.
ENGLISH
1 Pay-to-park system diagram
Magnetic
loop
Free spaces
display
Automatic
pay station
Manned pay
station
OCR video
camera
OCR video
camera
Barrier
Entrance unit
Exit unit
The PS ONE is designed for the use with devices with "native" Ethernet interface. This system management offers the opportunity
to configure numerous peripherals such as automatic pay stations, entry and exit units, entrances for permit holders, pedestrian
readers and manned pay stations.
Realisation of a pay-to-park system must account for specific features in order to achieve maximum usability and safety of use.
For example:
- consider all spaces and radii of vehicle manoeuvre. The entrance must comprise a space to station the vehicle in a convenient
manner for taking a ticket. We recommend a minimum distance of 2.8 m between the entrance unit and the barrier;
- Provide for pedestrian transit lanes clearly marked by vertical and horizontal signs to prevent accidents and make pedestrian
entrances and exits fast and orderly.
- Always evaluate the morphology of the site (e.g. gradients, areas with poor visibility, moving parts), to avoid collisions, dangerous
manoeuvres or danger to people. If necessary report potential risks with stripes, signs, mirrors, photocells and sensors.
Important: Ethernet connections must be ad hoc, tested and certified 10/100Mbit.
Verify the static IP addresses to be assigned to devices with your network administrator.
Assess the effectiveness of your Internet connection, which is essential for taking advantage of remote services (e.g. remote
assistance, reservations,
monitoring, sending and managing alarms)
Caution! Ensure that the protective devices against overcurrent, short circuits and earth faults in primary circuits,
are
installed and properly sized upstream of the system considered here.