background image

Pa

g

2

4

24

  - 

M

an

u

al

 C

od

e: 

11

9

G

F8

8

E

N

11

9

G

F8

8

E

N

 ve

r.

 

33

  1

0

/2

0

14 

 © C

A

M

E

 c

an

ce

lli

 auto

m

ati

ci

 s.p.a. - T

h

e d

ata a

n

d i

n

fo

rm

ati

on p

rovi

d

ed

 in

 th

is

 m

an

u

al

 a

re s

u

b

je

ct to c

h

an

g

e at a

ny ti

m

e w

ith

ou

t p

ri

or n

oti

ce

 by C

A

M

E

 C

an

ce

lli

 A

u

to

m

ati

ci

 S

.p.a.

ENGLISH

10.1 Preparing the entrance and exit unit

 

The following illustrations are only examples, given that the space for securing the entrance and exit units and 

accessories varies depending on the overall dimensions. The installation technician is responsible for choosing the most 
suitable solution. 

- Assemble the 4 anchor bolts to the plate.

-

 

Perform excavation for the foundation slab where to fi x the 

mounting plate. 
Recommended minimum size: 800x500x500 mm, taking into 
account the raised base (see dimensions on p. 8).
NOTE: The mounting plate is to be cemented on the raised base 
of 120 mm from the road surface. 
Set up corrugated tubes for the connections coming from the 
junction box. 
N.B. the tube diameter depends on the type of system installed 
and any accessories.

- Remove nuts and washers from the protruding bolts, place the cabinet on the base 
and secure it.

Note: Install the cabinet with the inspection door facing the easiest to reach direction. 

-

 

Fill the hole with concrete * and immerse the fi xing base (= plate + 

brackets) making sure that the corrugated tubing protrude through 
the hole arranged on the plate and id not fi lled with cement. Fit 
the corrugated tubes into the left hole with the power supply and 
ground while fi tting the Ethernet connection and accessories into 
the right hole. The base must be perfectly level, fully resting on the 
concrete surface, clean on all sides and with the screw threads fully 
on the surface. Wait for everything to solidify for at least 24 hours.

10 

Entrance unit / exit unit - installation

Nut M12 UNI 5588

Screws M12 x 40 UNI 5739

Washer

 

Wear protective gloves when installing the system.

* CONCRETE TECHNICAL CHARACTERISTICS

The concrete must be resistant to plastic deformation

 

with slump cone lowering 

between 4 and 7 cm (for a 30 cm conical mould, with, with a diameter of 10 
cm at the top and 20 cm in the lower part) and which must be fi lled in 4 layers.

BINDERS

use Portland cement without artifi cial constituents of  

CPA 325 type. 

AGGREGATES

calibre 10/20 and consist of limestone or silica free 

of salts and clays.

DOSAGE

350 kg/m³

(mm)

Содержание PS ONE

Страница 1: ...INSTALLATION MANUAL PS ONE PAY TO PARK CONTROL SYSTEM English EN 119GF88EN...

Страница 2: ...diagram 3 2 Description 4 3 Technical specifications 5 4 Wiring diagram 7 5 Dimensions mm 8 6 Example of system layout with side by side entrance and exit lanes 10 7 Entrance unit exit unit card and...

Страница 3: ...a space to station the vehicle in a convenient manner for taking a ticket We recommend a minimum distance of 2 8 m between the entrance unit and the barrier Provide for pedestrian transit lanes clearl...

Страница 4: ...ance unit that involves the following main functions ticket printing TAG RFID proximity card reading ISO format LCD TFT colour 5 7 monitor barcode and QR code reader also from smartphones optional Man...

Страница 5: ...Storage temperature 0 C 70 C Power supply 230 V 50 Hz 150 W Container Micro tower Microprocessor Dual Core 1 5 GHz AMD Turion II RAM PC3 10600E DDR 2GB HDD RAID 2 x 500GB SATA drivers Network control...

Страница 6: ...grated system with ABS plastic adjustable monitor Display 15 TFT LCD panel 1024x768 w resistive touch screen Microprocessor Intel E5300 Pentium Dual Core 2 60 GHz RAM DDR2 512 MB HDD 500 GB Dimensions...

Страница 7: ...ICLE DETECTION MAGNETIC loop VEHICLE DETECTION MAGNETIC loop Entrance unit Automatic pay station GSM router I O Interface Central server Intercom station Manned pay station ATM reader Receipt printer...

Страница 8: ...4 CAME cancelli automatici s p a The data and information provided in this manual are subject to change at any time without prior notice by CAME Cancelli Automatici S p a ENGLISH 5 Overall dimensions...

Страница 9: ...ME Cancelli Automatici S p a ENGLISH Automatic pay station The automatic pay station must be installed in a sheltered area protected from rain snow dust or other elements If necessary install elements...

Страница 10: ...E Cancelli Automatici S p a ENGLISH 6 Example of system layout with side by side entrance and exit lanes Note the example shows the minimum dimensions in mm between the components of the system These...

Страница 11: ...ection terminal 3 Fan and heater connection terminal 4 Barrier connection terminal 5 LED A Relay A active 6 LED B Relay B active 7 R700 optional card connection terminal 8 Paper sensor connection term...

Страница 12: ...B IN1 Vehicle presence detection of loop 1 IN2 Vehicle on Safety loop located under the barrier IN3 Vehicle presence detection of loop 2 optional IN4 Vehicle Classifier Axle Detection Activation optio...

Страница 13: ...ny time without prior notice by CAME Cancelli Automatici S p a ENGLISH 1 Ticket key 2 LCD Backlight 3 User keys 4 Ticket slit LED 5 Rfid Reader 6 Brightness sensor 7 Power supply and data input 8 Loud...

Страница 14: ...ption 1 VAC power supply input 2 Interior lighting connection terminal 3 Fan and heater connection terminal 4 Remote alarm output terminal 5 Reset relay terminal 6 Power supply detector terminal 7 Pap...

Страница 15: ...ompartment IN2 Middle door closed cash compartment IN3 Collection Drawer Fitted IN4 Coins Drawer Fitted IN5 Coins Drawer Engaged IN6 Vac power present LED index input on automatic pay station card USB...

Страница 16: ...CCTALK address selection Dipswitch 6 CCTALK 5 Channel change return Hopper 1 connection 7 CCTALK 3 Channel connection available 8 CCTALK 2 Channel change return Hopper 2 connection 9 CCTALK 1 Channel...

Страница 17: ...t any time without prior notice by CAME Cancelli Automatici S p a ENGLISH Automatic Pay Station Connections Board 1 Coin slot shutter 2 LCD Backlight 3 User keys 4 Ticket slit LED 5 Rfid Reader 6 Brig...

Страница 18: ...with hooks at the end with a capacity of at least 250 kg in the seats on the head of the central element Use a mechanical arm to tension the steel cables and then lift the central element and bring i...

Страница 19: ...in this manual are subject to change at any time without prior notice by CAME Cancelli Automatici S p a ENGLISH Position the top element above the central one and then secure the nine screws supplied...

Страница 20: ...ween the two parts that make up the cabinet with the supplied cable Power from the main electrical panel of the site to provide adequate all pole disconnect device for disconnecting line voltage MCB R...

Страница 21: ...hout prior notice by CAME Cancelli Automatici S p a ENGLISH Plug the power cables in the correct locations of the socket Fix the shell on the socket by tightening the respective fixing screws Inside t...

Страница 22: ...es in the electrical panel located in the upper part of the cabinet 9 4 Switching on V AC service outlet 100 VA maximum load protected by S1 230V version only SWITCH DESCRIPTION S1 Input circuit break...

Страница 23: ...ance Green Operation successful 9 6 Automatic Pay Station power supply wiring diagram Devices CPU and AUTOMATIC PAY STATION Additional heater Power supply 2 Large 24 V DC 9 6 A 230 W Reset command 24V...

Страница 24: ...otruding bolts place the cabinet on the base and secure it Note Install the cabinet with the inspection door facing the easiest to reach direction Fill the hole with concrete and immerse the xing base...

Страница 25: ...he container In the entry station remove the screw that secures the Roboticket printer or base printer 11 1 Vehicle detection loops connection Locate the two channel sensor on the left side of the uni...

Страница 26: ...ier connection Access to the control board of the unit by removing the cover of the container Open command Close command From the connec tor of the open barrier gate LED Identify the connection to the...

Страница 27: ...n connect the vehicle crossing loop On the unit control board locate the terminal to connect the SMA detector installed in the barrier and then make connections NB For installation and programming see...

Страница 28: ...e to provide adequate all pole disconnect device for disconnecting line voltage MCB RCD Required characteristics Circuit breaker with breaking current up to 16 A 230 V or 25 A 120 V RCD with 30 mA sen...

Страница 29: ...on provided in this manual are subject to change at any time without prior notice by CAME Cancelli Automatici S p a ENGLISH Plug the power cables in the correct locations of the socket Fix the shell o...

Страница 30: ...6 ETHERNET connection 11 7 Switching on Inside the bottom section of the unit connect the Ethernet cable to its terminal After making all electrical connections switch on the entrance and exit unit by...

Страница 31: ...hite Maintenance mode Flashing Red Out of Service Alarm Green Barrier opening Serial CPU and Accessories Traffic light connections Standard internal fans and heater Power supply AC DC PSONE V AC input...

Страница 32: ...a l ngua PL Wszystkie inne informacje dotycz ce rmy produkt w oraz us ug i pomocy technicznej w Waszym j zyku znajduj si na stronie RU HU A v llalatra term keire s a m szaki szervizre vonatkoz minden...

Отзывы: