*
p.
8
- M
an
u
al
FA
0
1
0
5
4
-E
N
- 0
1/
2
0
18 - © C
A
M
E S
.p.
A
. -
Tr
ansla
tio
n of t
he o
riginal inst
ru
ct
io
ns
Preliminary operations
Fit junction boxes and corrugated tubing needed for the incoming connections from the distribution pit.
The number of tubes depends on the type of system and the accessories you are going to fi t. You need to set up at least
two corrugated tubes where the operator will be installed (
*
on the gate leaf that opens fi rst).
INSTALLATION
⚠
Only skilled, qualifi ed staff must install this product.
⚠
The following illustrations are mere examples in that the space for fastening the operator and accessories varies
depending on the installation area. It is up to the fi tter, therefore, to choose the most suitable solution.
The following drawings refer to a standard installation with the operator and drive arms on the left of an inward-
opening gate. Installing the gear motor with right-hand drive arms, is symmetrical.
⚠
For outward opening gate leaves, follow the chapter titled "INSTALLING AND CONNECTING FOR OUTWARD
OPENING".
Содержание OPB001CB
Страница 2: ...1 2 3 1 2 3 ...
Страница 31: ...Pag 31 Manuale FA01054 IT 01 2018 CAME S p A istruzioni originali ...
Страница 33: ...Swing gate operator OPB001CB INSTALLATION MANUAL EN English FA01054 EN ...
Страница 34: ...1 2 3 1 2 3 ...
Страница 63: ...p 31 Manual FA01054 EN 01 2018 CAME S p A Translation of the original instructions ...
Страница 65: ...Automatisme pour portails battants OPB001CB MANUEL D INSTALLATION FR Français FA01054 FR ...
Страница 66: ...1 2 3 1 2 3 ...
Страница 95: ...Page 31 Manuel FA01054 FR 01 2018 CAME S p A Traduction des instructions originales ...
Страница 97: ...Автоматика для распашных ворот OPB001CB РУКОВОДСТВО ПО УСТАНОВКЕ RU Русский FA01054 RU ...
Страница 98: ...1 2 3 1 2 3 ...
Страница 127: ...Стр 31 Руководство FA01054 RU 01 2018 CAME S p A Перевод оригинальных инструкций ...