24h
350
400
200
P.
88
- M
a
n
u
a
l c
o
d
e
1
1
9
G
V
6
5
11
9
G
V
6
5
v
e
r.
2
.1
2
.1
0
2
/2
0
11 © C
A
M
E
C
a
n
ce
lli A
u
to
m
a
ti
ci
S
.p.
a
. - T
h
e d
a
ta a
n
d i
n
fo
rm
ati
o
n i
n
t
h
is
m
a
n
u
a
l m
ay b
e c
h
a
n
g
e
d at a
n
y time a
n
d wit
h
o
u
t o
b
lig
a
ti
o
n
o
n
t
h
e p
a
rt
of C
a
me C
a
n
ce
lli A
u
to
m
a
ti
ci
S
.p.
a
. to n
o
tif
y s
a
id
c
h
a
n
g
e
s.
ENGLISH
Assemble the four clamps to the anchoring base.
Fill the pit with cement and sink the base,
making sure that the corrugated tubes pass
through the spefi cic hole in the plate.The base
must be perfectly level, clean and with the bolt
threading completely on the surface.
Wait at least 24 hrs for everything to solidify.
Remove the nuts and washers from the
threaded screws.
The following illustrations are just examples, in that the space for securing the operator and accessories depends on the overall
measurements. It is up to the installer to choose the most suited solution.
Dig a pit for the anchoring
base and set up the required
corrugated tubes for the
connections coming out of the
junction pit.
N.B.: the number of tubes
depends on the type of
accessories featured.
Preparing the anchoring base
M12 UNI 5588 nut
Washer
M12 x 40 UNI 5739
screw