340
1204
332
max. 2750
884
320
217
P.
66
- M
a
n
u
a
l c
o
d
e
1
1
9
G
V
6
5
11
9
G
V
6
5
v
e
r.
2
.1
2
.1
0
2
/2
0
11 © C
A
M
E
C
a
n
ce
lli A
u
to
m
a
ti
ci
S
.p.
a
. - T
h
e d
a
ta a
n
d i
n
fo
rm
ati
o
n i
n
t
h
is
m
a
n
u
a
l m
ay b
e c
h
a
n
g
e
d at a
n
y time a
n
d wit
h
o
u
t o
b
lig
a
ti
o
n
o
n
t
h
e p
a
rt
of C
a
me C
a
n
ce
lli A
u
to
m
a
ti
ci
S
.p.
a
. to n
o
tif
y s
a
id
c
h
a
n
g
e
s.
ENGLISH
Dimensions
Before beginning to install, the following is necessary:
Set up proper omnipolar cut-off device, with more than 3mm of distance between contacts, with sectioned power source;
• Set up proper conduits and electric cable raceways, making sure these are protected from any mechanical damage;
• Set up a drainage tube to prevent stagnation of moisture that can lead to oxydation;
•
Check that any connections inside the container (made for continuity purposes of the protective circuit) be fitted with extra insulation
compared to other internal conductive parts;
Installation must be carried by skilled, qualified technicians in accordance with current regualtions.
Tools and equipment
Make sure you have all the tools and materials needed to carry out the installation in total safety and in accordance with current regula-
tions. The figure shows some examples of the tools needed by installers.
Installation
Preliminary checks