p.
31
- M
an
ua
l
FA
00
441
-E
N
- 0
8/
20
18 - © C
AM
E S
.p
.A
. -
Tr
an
sla
tio
n o
f t
he o
rig
in
al i
ns
tru
ct
io
ns
SETTING UP
Once the electrical connections are complete, have skilled staff commission the operator.
Before continuing, make sure the area is free of any obstructions, and that there are mechanical, opening and
closing gate stops in place.
Power up and begin configuring the system.
Important!
Start programming by first doing the following functions:
- type of motor (A1);
- number of motors (F46);
- motors test (A2), see the specific paragraph;
- travel calibration (A3), see the specific paragraph.
Once the programming is done, verify that the operator and all the accessories are working properly. Use the < >
keys to open and close the gate, and the ESC key to stop it.
After powering up the system, the first maneuver is always the opening. In this phase, the gate cannot be
closed. You will need to wait for the gate to completely open.
⚠
Immediately press the STOP button if any suspicious malfunctions, noises or vibrations occur in the system.
Commissioning should be done also after each restoring procedure (A4).
A2
Motors test
Test for checking the gearmotors' proper rotating directions (see the MOTORS
TEST paragraph).
OFF
/
ON
A3
Travel calibration
Calibrating the gate travel (see the paragraph called CALIBRATING THE GATE
TRAVEL).
This function appears only is the Encoder function is activated.
OFF
/
ON
A4
Resetting parameters
Attention! The default settings will be restored.
OFF
/
ON
A5
Maneuver count
For viewing the number of maneuvers completed or for deleting them (001 =
100 maneuvers; 010 = 1,000 maneuvers; 100 = 10,000 maneuvers; 999 =
99,900 maneuvers; CSI = maintenance job)
H1
Version
View the firmware version.