600
1000
1100
5
4
8
1
8
7
9
10
6
2
3
3
11
11
11
P
ag
e 6
- M
an
u
al c
od
e:
11
9
A
U
0
3
E
N
11
9
A
U
0
3
E
N
ve
rs
.
5
0
3
/2
0
1
6 © C
A
M
E S
.p.
A
. - T
h
e d
ata a
n
d i
nf
or
m
ati
on p
rovi
d
ed i
n th
is m
an
u
al a
re s
u
b
je
ct to c
h
an
g
e at a
ny ti
m
e w
ith
ou
t p
rio
r n
ot
ic
e by C
A
M
E S
.p.
A
.
Example of a system
1. Right-hand gearmotor with foundation box
2. Left-hand gearmotor with foundation box
3. Junction
box
4. Control panel
5. Antenna
6. Flashing
light
7. Key
selector
8. Photocells
9. Inspection
chamber
10. Drainage chamber
11. Mechanical stops
Laying the corrugated pipes and inspection chambers
Make the hole for the box.
Prepare the junction boxes and corrugated pipes necessary for connection to the inspection chamber and the drain pipe.
N.B. the number of tubes depends on the type of system installed and any accessories.
INSTALLATION
⚠
The following illustrations are only examples, given that the space for securing the operator and accessories varies depending on the overall dimensions.
The installation technician is responsible for choosing the most suitable solution.
The following drawings refer to a standard installation of an inward opening gate.