95
106
p.
10
- M
an
ua
l
FA
010
04
-E
N
- 0
1/
20
18 - © C
AM
E S
.p
.A
. - T
ra
ns
la
te
d o
rig
in
al i
ns
tru
ct
io
ns
Remove the nut and washer from the bolts
Fit the electric cables into the tubes so that they come out about 600 mm.
Fill the foundation frame with concrete. The plate must be perfectly level with the bolts which are entirely above
surface.
Wait at least 24 hrs for the concrete to solidify.
Remove the foundation frame and fill the hole with earth around the concrete block.
If the rack is already there, place the anchoring plate, being careful to respect the measurements shown in the
drawing.
Careful! The tubes must pass through their corresponding holes.
Содержание BXV Series
Страница 2: ......
Страница 38: ......
Страница 70: ...p 34 Manual FA01004 EN 01 2018 CAME S p A Translated original instructions ...
Страница 71: ...p 35 Manual FA01004 EN 01 2018 CAME S p A Translated original instructions ...
Страница 74: ......
Страница 106: ...Page 34 Manuel FA01004 FR 02 2018 CAME S p A Traduction des instructions originales ...
Страница 107: ...Page 35 Manuel FA01004 FR 02 2018 CAME S p A Traduction des instructions originales ...
Страница 110: ......
Страница 142: ...Стр 34 Руководство FA01004 RU 02 2018 CAME S p A Перевод оригинальных инструкций ...
Страница 143: ...Стр 35 Руководство FA01004 RU 02 2018 CAME S p A Перевод оригинальных инструкций ...