Installation must be carried out by expert qualified personnel and in full compliance with current regulations.
Before installing, do the following:
• Make sure that the gate is stable, and that the castors are in good working order and properly greased.
• The ground rack must be well secured to the ground, entirely above the surface and free of any irregularities that may obstruct the gate’s
movement.
• The upper guide rails must not create any friction.
• Make sure that there is a closing and an opening endstops.
• Make sure that the operator is attached to a solid surface and protected from any impacts;
• Make sure you have a suitable omnipolar cut-off device with contacts more than 3 mm apart, and independent (sectioned off) power
supply;
• Check that any connections inside the container (that provide continuity to the safety circuit) are fitted with additional insulation
compared to other internal live parts;
• Make sure you have suitable tubing and conduits for the electrical cables to pass through and be protected against mechanical damage.
1 - Top cover
2 - Settings casing
3 - Control board support
4 - Endstop fins
5 - ZBX-10 electronic card
6 - Front cover to control panel
7 - Gearmotor release door
8 - Securing plate
9 - Securing bolt
10 - Securing screw plate
11 - Nut
Dimensions
Description of parts
Installation
Preliminary checks
p.
5
- M
anu
al
FA
0
1
1
3
7
-E
N
- 0
4
/2
0
18 - © C
A
M
E S
.p
.A
. - T
ransla
te
d o
riginal inst
ru
ct
io
ns