Page 5-1
Chapter 5:
Installation
This chapter describes how to install and test the hardware for a PTP 670 link. It contains the
following topics:
•
contains important safety guidelines that must be observed by
personnel installing or operating PTP 670 equipment.
•
ODU variants and mounting bracket options
provides details of six different
bracket options, including the type of ODu and range of pole diameters supported by each
option.
•
Installing the ODU and top LPU
describes how to mount and ground an
Integrated or Connectorized ODU, and how to mount and ground the top LPU.
•
Install external antennas for a Connectorized ODU
and connect an external antenna for the Connectorized ODU.
•
Installing the copper Cat5e Ethernet interface
copper Cat5e power over Ethernet interface from the ODU (PSU port) to the PSU.
•
describes how how to install a power supply unit for the
PTP 670, either the AC Power Injector 56V, the AC+DC Enhanced Power Injector 56V, or the
CMM5.
•
describes how to install a PTP-SYNC unit for TDD
synchronization.
•
Installing the Trimble Accutime
GPS receiver on page
describes how to install a GPS
receiver as the timing reference source for PTP-SYNC or CMM5.
•
describes how to install a network indoor unit (NIDU) for
TDM (T1 or E1) interfaces.
•
Installing an SFP Ethernet interface
describes how to install an optical or
copper Cat5e Ethernet interface from the ODU (SFP port) to a connected device.
•
Installing an Aux Ethernet interface
on page
describes how to install a copper Cat5e
Ethernet interface from the ODU (Aux port) to a connected device.
•
Supplemental installation information
on page
contains detailed installation
procedures that are not included in the above topics, such as how to strip cables, create
grounding points and weatherproof connectors.
Note
These instructions assume that LPUs are being installed from the LPU and grounding
kit (Cambium part number C000065L007A). If the installation does not require LPUs,
adapt these instructions as appropriate.
If LPUs are being installed, only use the five black-capped EMC cable glands supplied
in the LPU and grounding kit. The silver-capped cable glands supplied in the ODU kits
must only be used in PTP 670 installations which do not require LPUs.
Содержание PTP 670 Series
Страница 1: ...F Cambium PTP 670 Series User Guide System Release 670 02 50 ...
Страница 349: ...Chapter 5 Installation Installing an SFP Ethernet interface Page 5 52 Correct Incorrect ...
Страница 405: ...Chapter 6 Configuration and alignment System menu Page 6 46 Figure 151 LAN Configuration page PTP topology TDM support ...
Страница 406: ...Chapter 6 Configuration and alignment System menu Page 6 47 Figure 152 LAN Configuration page PTP topology SFP support ...
Страница 408: ...Chapter 6 Configuration and alignment System menu Page 6 49 Figure 154 LAN Configuration page HCMP topology ...
Страница 416: ...Chapter 6 Configuration and alignment System menu Page 6 57 Figure 156 QoS Configuration page IP MPLS ...
Страница 445: ...Chapter 6 Configuration and alignment Management menu Page 6 86 Figure 173 Time Configuration page SNTP enabled ...
Страница 551: ...Chapter 7 Operation System statistics Page 7 64 Figure 250 Main Port Counters page when main port is bridging traffic ...