Chapter 2: System hardware
Ethernet cabling
Page 2-35
Table 37 LPU and grounding kit part number – Use with GPS receiver drop cable only
Cambium description
Cambium part number
LPU End Kit PTP 250/300/500
WB2978
RJ45 connectors and spare glands
RJ45 connectors are required for plugging Cat5e cables into ODUs, LPUs, PSUs and other
devices. Order RJ45 connectors and crimp tool from Cambium Networks (
Note
The RJ45 connectors and crimp tool listed in
BBDGe cable (as supplied by Cambium Networks). They may not work with other
types of cable.
The ODU is supplied with one environmental sealing gland for the drop cable. However, this is
not suitable when surge protection is required: EMC glands must be used instead. EMC strain
relief cable glands (quantity 5) are included in the LPU and grounding kit (
). These are
identified with a black sealing nut. If extra glands are required, order them from Cambium
Networks (in packs of 10) (
One long EMC strain relief gland (
) is included in each SFP module kit. This is longer
than the standard cable gland as it must house an SFP module plugged into the ODU.
Figure 24 Cable gland
Table 38 RJ45 connector and spare gland part numbers
Cambium description
Cambium part number
Tyco/AMP, Mod Plug RJ45 Unscreened, 100 pack
WB3177
Tyco/AMP Crimp Tool
WB3211
RJ-45 Spare Grounding Gland - PG16 size (Qty. 10)
N000065L033
Cable hoisting grip
One or more grips are required for hoisting the drop cable up to the ODU without damaging
the gland or RJ45 plug (
). They are not supplied by Cambium Networks.
Содержание PTP 670 Series
Страница 1: ...F Cambium PTP 670 Series User Guide System Release 670 02 50 ...
Страница 349: ...Chapter 5 Installation Installing an SFP Ethernet interface Page 5 52 Correct Incorrect ...
Страница 405: ...Chapter 6 Configuration and alignment System menu Page 6 46 Figure 151 LAN Configuration page PTP topology TDM support ...
Страница 406: ...Chapter 6 Configuration and alignment System menu Page 6 47 Figure 152 LAN Configuration page PTP topology SFP support ...
Страница 408: ...Chapter 6 Configuration and alignment System menu Page 6 49 Figure 154 LAN Configuration page HCMP topology ...
Страница 416: ...Chapter 6 Configuration and alignment System menu Page 6 57 Figure 156 QoS Configuration page IP MPLS ...
Страница 445: ...Chapter 6 Configuration and alignment Management menu Page 6 86 Figure 173 Time Configuration page SNTP enabled ...
Страница 551: ...Chapter 7 Operation System statistics Page 7 64 Figure 250 Main Port Counters page when main port is bridging traffic ...