Chapter 6: Installation
Mount the ODU, LPU and surge suppressor
Page 6-10
Mount the top LPU
1
For separate LPU mounting, use the U-bolt bracket
from the LPU kit to mount the top LPU on the pole
below the ODU. Tighten to a torque setting of 7.0
Nm (5.2 lb ft).
Please refer
Gigabit LPU and Grounding Kit
Installation Guide
for more details.
Mount the Surge Suppressor
PMP/PTP 450i/450b Series
Gigabit Ethernet Surge Suppressors are installed at both ends of the drop cable. One within 600 mm
(24”) of and under the ODU. The other located within 600 mm (24”) of the building entry point.
Quick procedure:
The quick procedure for the Surge Suppressor for PMP/PTP 450i/450b Series mounting is as follows:
1
Ground using the terminal on the back of the units.
Use the supplied Tubular Lug and 6 mm2 (10 AWG)
stranded cable, max length 600 mm (24”).
I.
Waterproof the cable lug with heat
shrink sleeving.
II.
Secure the Cable assembly to the unit using the
supplied screw and washer.
2
Mount the Gigabit Ethernet Surge Suppressor on the
wall or pole
Содержание PMP 450 AP
Страница 1: ...33F Cambium 450 Platform User Guide System Release 15 2 pass...
Страница 14: ...Contents Page xii 450m overload I Glossary III...
Страница 91: ...Chapter 2 System hardware System Components Page 2 27 Figure 16 Gigabit Enet Capable power supply...
Страница 104: ...Chapter 2 System hardware Cabling Page 2 40...
Страница 139: ...Chapter 3 System planning Typical deployment Page 3 6 Figure 44 GPS receiver tower or mast installation...
Страница 157: ...Chapter 3 System planning Radio Frequency planning Page 3 24 Figure 49 Sector Antenna...
Страница 158: ...Chapter 3 System planning Radio Frequency planning Page 3 25 Figure 50 cnMedusa Antenna...
Страница 189: ...Chapter 3 System planning Remote AP Deployment Page 3 56 Figure 59 Remote AP wired to SM that serves as a relay...