Chapter 6: Installation
Mount the ODU, LPU and surge suppressor
Page 6-3
Mount the ODU, LPU and surge suppressor
To install the ODU and top LPU, use the following procedures:
Attach ground cables to the ODU
on page
6-3
Mount the ODU on the mast
on page
6-6
Mount the top LPU
on page
6-10
Mount the Surge Suppressor
on page
6-10
Attach ground cables to the ODU
PMP 450m Series – AP
1
Fasten an AWG 10 (or 6mm
2
) copper ground
cable to each ODU grounding point using the M6
(small) lugs.
2
Secure the M6 grounding bolts by applying 3 Nm
torque..
3
Securely connect the copper wires to the
grounding system (Protective Earth) and the LPU
or Gigabit Ethernet Surge Suppressor according to
applicable regulations.
Содержание PMP 450 AP
Страница 1: ...33F Cambium 450 Platform User Guide System Release 15 2 pass...
Страница 14: ...Contents Page xii 450m overload I Glossary III...
Страница 91: ...Chapter 2 System hardware System Components Page 2 27 Figure 16 Gigabit Enet Capable power supply...
Страница 104: ...Chapter 2 System hardware Cabling Page 2 40...
Страница 139: ...Chapter 3 System planning Typical deployment Page 3 6 Figure 44 GPS receiver tower or mast installation...
Страница 157: ...Chapter 3 System planning Radio Frequency planning Page 3 24 Figure 49 Sector Antenna...
Страница 158: ...Chapter 3 System planning Radio Frequency planning Page 3 25 Figure 50 cnMedusa Antenna...
Страница 189: ...Chapter 3 System planning Remote AP Deployment Page 3 56 Figure 59 Remote AP wired to SM that serves as a relay...