Chapter 4: Cable Installation and Grounding
Cable Grounding
phn-3972 004v000
Page 4-6
.
2 Place the cable lug (supplied with the grounding kit) on the screw.
3 Secure the cable lug.
4 The second side of the GND cable should be connected to the main ground bar or terminal
ground bar of the site.
5 Perform a resistance test between the 2 lugs of the GND cable. Verify that the result is 0-2
ohms.
Note
The unit’s grounding screw terminal is permanently connected to protective earth in a
building installation in accordance with applicable national code and regulations by a
service person.
A 2-pole circuit breaker, a branch circuit protector, suitably certified in accordance with
applicable national code and regulations, rated maximum 20A, shall be installed for
full power disconnection in a building installation.
Any outdoor antenna cable shield is permanently connected to protective earth in a
building installation.