Chapter 8: Acceptance and Commissioning Procedures
Radio Link Commissioning Procedure
phn-3972 004v000
Page 8-30
Management Verification
•
Launch the HTTP management and verify that you can manage the link and that you are able
to perform changes to the link configuration (frequency channel, Tx power, system name, time
& date, etc.)
•
Verify that correct parameters are reported when performing the above.
•
Verify that there are no active alarms on the link.
•
If the management station is located at a remote site (Network Operation Center), verify that
the management station can manage the link and receive traps.