background image

 

1.

 

Introduction

 

This operating manual is a customer document of the company Calyxo GmbH, based in Thalheim, 

Germany. It describes how to handle Calyxo solar modules and construct solar fields using modules 

made by Calyxo. Please read this operating manual carefully before you store, install

 

or handle the modules in any other manner. This manual includes safety instructions for using, 

installing, mounting, wiring and storing Calyxo CdTe solar modules.

 

 

Calyxo CdTe solar modules allow you to transform the unlimited energy provided by the sun into 

environmentally friendly electrical power. Please take note of all the following requirements and 

instructions in order to be able to make full use of the performance capacity of Calyxo solar modules.

 

 

Ensure that the installation, operational and maintenance work is only undertaken by qualified 

personnel having the specialist expertise described in this operating manual, are being familiar with this 

operating manual and are aware of and observe the applicable regulations for occupational safety and 

accident prevention.

 

 

Store this operating manual for future reference.

 

 

This manual exclusively applies to installations in Germany, Europe, USA and Canada. Prior to 

installing Calyxo solar modules at any other location, please contact your distributor. Additional 

guidelines and instructions or indication about country-specific information will be provided upon 

request.

 

Содержание CX1

Страница 1: ...OPERATING MANUAL CX SERIES REV2 0 May 2017 EN EU USA Canada...

Страница 2: ...S 7 4 MECHANICAL SPECIFICATIONANDDRAWING 10 5 ELECTRICAL SPECIFICATION 11 6 INSTALLATION 12 6 1 MOUNTING 12 6 2 MOUNTING VARIANTS 14 6 3 INSTALLATION SITE MODULE ORIENTATION 15 6 4 AVOIDINGSHADE 16 6...

Страница 3: ...all the following requirements and instructions in order to be able to make full use of the performance capacity of Calyxo solar modules Ensure that the installation operational and maintenance work i...

Страница 4: ...cted to a control device such as an inverter or a chargecontroller Calyxo solar modules are developed and constructed in keeping with the latest technological developments When used properly in accord...

Страница 5: ...ion Physically disconnecting a closed electrical circuit could cause electrical voltage and currents such as electric arcs to arise These could result in life threatening injuries The risk increases w...

Страница 6: ...concentrators such as mirrors or lenses or any other means to artificially concentrate light to increase the power output of the modules Doing so can damage the modules and shall render the extended w...

Страница 7: ...key to safely handling glass is correctly selecting and using personal protective equipment Always ensure your own safety and wear safety goggles safety shoes and cut resistant gloves Gauntlet gloves...

Страница 8: ...revention at constructionsites If you intend to install the modules on a rooftop or at a height observe the specialist regulations set out by the roofing trade Ensure proper fall protection since fall...

Страница 9: ...uest documentation an acceptance report and an inspection report for the PV system with the minimum requirements set out by IEC DIN EN 62446 or VDE 0126 23 from the installer Store these reports toget...

Страница 10: ...iew CX3pro Figure 3 Rear side view CX1 Figure 4 Front side view A CX3 9 0 mm CX3pro 7 0 mm CX1 9 0 mm CX4 7 0 mm Specification CX1 CX3 CX3pro CX4 Length 1200 mm Width 600 mm Weight 12 kg Structure Gla...

Страница 11: ...t Current I sc A 10 Open Circuit Voltage V oc V 10 Current at Maximum Power I mp A 10 Voltage at MaximumPower V mp V 10 Maximum System Voltage 1000V IEC 600V UL Design Load 2400Pa IEC 50lb ft UL STC 1...

Страница 12: ...ditions irradiance of 100 mW cm2 AM 1 5 spectrum and a cell temperature of 25 C 77 F TECHNICAL DATA Additional data including details of the electrical characteristics for the CX series power classes...

Страница 13: ...cture that corresponds to the required statics and the local wind snowloads that can be properly fastened in the ground on the roof or on the facade that can transfer forces on the modules to the asse...

Страница 14: ...lication The recommended minimum standoff height is 3 25 in 82 55 mm Modules used in UL Listed rooftop applications must be installed with approved mounting systems If alternate mounting means are emp...

Страница 15: ...that no direct contact is made between glass and metal Use a suitable silicone free rubber support between the modules andclamps Clamp width figures 7 to 8 70 0 mm A minimum lateral distance between...

Страница 16: ...ny point THEFOLLOWINGMOUNTINGVARIANTSARE POSSIBLE Substructure lateral beneath the module with two clamps per module side figure 7 Substructure diagonal beneath the longer sides with two clamps per mo...

Страница 17: ...is only splash proof Solar modules are not explosion proof equipment Do not install the modules in the proximity of highly flammable gases and vapors such as gas containers petrol stations or near ope...

Страница 18: ...angles of inclination less than3 longitudinal side of the module from the eave it needs to be ensured that adherent contamination is removed by sufficient precipitation or through regular manual clean...

Страница 19: ...dry place The packaging is not weather resistant Ensure that even at low temperatures and or solar radiation of over 1000 W m the maximum open circuit voltage of the wired modules does not exceed the...

Страница 20: ...a module the multiplying factor at conditions of an irradiance of 125 mW cm2 AM 1 5 spectrum and a cell temperature of minus 10 C plus 14 F for VOC and plus 75 C 167 F for ISC is to be determined and...

Страница 21: ...rotected against reverse currents from the rest of the system with a string diode Within the scope of DIN VDE 0100 712 2016 10 diodes are no longer permitted as reverse currentprotection Usually each...

Страница 22: ...ed with the module Install functional grounding for the solar power system when you are installing it in a country or a system in which functional grounding is necessary orprescribed Direct grounding...

Страница 23: ...pro CX4 MC4 connectors of part numbers PV KST4 PV KBT4 CX1 feature MC3 connectors of part numbers PV KST3 PV KBT3 Please note the following when selecting connecting cables and connectors Only use pr...

Страница 24: ...otected from dirt and moisture The connectors are not lying on a water collecting surface and are firmly connected toone another All necessary security and functional inspections have been carried out...

Страница 25: ...te evening Do not wear any conductive pieces or clothing Never enter the installation area alone and without protection We recommend commissioning a specialist company with this work Ask your installe...

Страница 26: ...om the top of the module in the following sequence Rinse off coarse soiling dust foliage etc from the modules with lukewarmwater Moisten stubborn soiling and carefully removeit Use lukewarm water and...

Страница 27: ...cle and environmentally sustainable disposal of electrical and electronic devices is to be understood as a special law under the scope of the general German waste legislation which is laid out in the...

Страница 28: ...information is always accessible and corresponds to the latest status However Calyxo assumes no responsibility for its use or for injuries to patentsor the rights of third parties that may result from...

Страница 29: ...11 Notes...