8.Needed tools
19
8. Needed tools
The following tools are needed for the installation of the heater:
7 mm wrench – Fuel connections and duct clamps
10 mm wrench – Heater mounting
13 mm wrench – Exhaust clamp
In case you need to install lines through bulkheads the following drill heads
may be needed:
6 mm - Fuel lines
25 mm - Fuel tank diver
30 mm - Air intake line
35 mm - Exhaust line
60/90 mm - Air duct (2 and 4 kW respectively)
Содержание Calaer 2 kW
Страница 1: ...Installation manual 2kW Calaer air heater 4kW Calaer air heater...
Страница 2: ......
Страница 4: ...2...
Страница 8: ...6...
Страница 12: ...10...
Страница 14: ...12...
Страница 15: ...6 Heaterdimensions 13 6 Heater dimensions Calaer 2 kW heater All measurements are given in millimeters mm...
Страница 16: ...6Heaterdimensions 14 Calaer 4 kW heater All measurements are given in millimeter mm...
Страница 17: ...6 Heaterdimensions 15...
Страница 18: ...16...
Страница 20: ...18...
Страница 22: ...20...
Страница 28: ...26...
Страница 38: ...36...
Страница 44: ...42...
Страница 48: ...13 Electricalsystem 46 13 4 Wiring diagram Figure Wiring diagram for Calaer 2 and 4 kW air heaters...
Страница 58: ......