background image

Remote Control & Timer Delay Closing

 

Figure  23

A. 

Remote Control delay closing

 

1.

Choose  time  delay  to  activate  operator  between  0~6  seconds  by  turning  knob  on

DELAY 

15

Features

Figure 22 

2. CLOSE Sensitivity:  Increase/decrease  amount  of  force  by turning knob clockwise/

counter clockwise. This is the fourth blue knob on the circuit board. Figure 22, left.

1. OPEN Sensitivity: Increase/decrease amount of force by turning knob clockwise/

counter clockwise. This is the third blue knob in the circuit board. Figure 22, left.

3. Test device sensitivity every 6 months.

Sensitivity

The sensitivity has to do with the weight of the gate, and also other factors. A heavier gate will require 

less sensitivity, and a lighter gate will require more sensitivity.

If a gate is too sensitive, the gate may stop or reverse by itself. It it's not sensitive enough, it might 

not stop or reverse.

1. On your gate operator circuit board in the bottom, turn Dip Switch #2 to the ON

position. Figure 24

2. On the gate operator circuit board, adjust the delay by turning the second blue knob

from 0-60 seconds. Figure 25

Auto Close

This allows your gate to automatically close after opening it.

Figure 24

Figure 25

Содержание CM7-ACFP

Страница 1: ...CM7 ACFP Instruction Manual www calimetco com 9949 Hayward Way South El Monte CA 91733 Tel 626 452 9009 Swing Gate Operator...

Страница 2: ...risk of injury or death Use the emergency release only when the gate is not moving Keep the gate properly maintained Read the owner s manual on how to maintain your gate Have a certified service techn...

Страница 3: ...re 2 Wedge Anchor Step 1 Installing the Base The base also known as a pad is a raised platform We recommend using a concrete base 1 2 x 3 1 2 2 Contact local underground utility locating companies bef...

Страница 4: ...sed positions weld gate bracket and arm Figure 4 A Should be at least 1 4 the gate length NOTE Uphill or heavy gates should be at least 1 3 gate length B 14 minimum for open gate clearance 2 thick gat...

Страница 5: ...h stress is put on the arm in this position during gate operation Figure 6 A Preferred arm position is 90 from the open gate B Distance between door and machine 2 min Installation Figure 5 C 4 NOTE If...

Страница 6: ...Figure 7 Support bar should be installed at the gate bracket height across the entire gate to keep the gate pickets from bending Installation 5...

Страница 7: ...nimum capacity for 25 amp current 2 All operators MUST be properly grounded in order to prevent an electrical charge Must use a dedicated circuit for power supply 3 When the power is connected turn op...

Страница 8: ...on the gate operator control board 3 Mount the photo eye on the stationary part of your gate or a post next to your gate about 21 from the ground 4 Press the orange button on the photo eye to turn on...

Страница 9: ...eft or right on both limit cams to adjust the position of where the gate opens and closes Figure 9 TIP Use the OPEN CLOSE STOP buttons on the gate operator circuit board for faster testing 3 Use the s...

Страница 10: ...eset the pedal only when the operator doesn t work while using the remote control 1 Push the pedal downward from locked position and slightly move to the left 2 Allow the pedal rise up to the reset po...

Страница 11: ...Figure 15 Features Safety and Exit Loop This is an optional step If you wish to install a exit loop detector see figure 15 for the position of the safety and exit loops Entrapment Protection 10...

Страница 12: ...Figure 16 Features Control Board Layout This is a picture of the control board Use this for reference Youtube Circuit board Programming Guide https youtu be _7iBuKr1ZtY 11...

Страница 13: ...on B Unscrew the back of the remote control to gain access to the control board You should see 1 8 dip switches Each switch has 3 positions up middle bottom Flip these 1 8 switches to any position you...

Страница 14: ...emote control to direct gate movement whenever gate is moving in any direction Use first signal to stop gate use second signal to move gate to opposite direction 4 1 PASS Anti tailgating system It cor...

Страница 15: ...position 2 Use UL proved electric wire connect DATA and DATA from Master control board to Slave control Board then connect DATA and DATA accordingly 3 M LINK light turns to solid bright 14 Features Ex...

Страница 16: ...ircuit board Figure 22 left 3 Test device sensitivity every 6 months Sensitivity The sensitivity has to do with the weight of the gate and also other factors A heavier gate will require less sensitivi...

Страница 17: ...9949 Hayward Way South El Monte CA 91733 Tel 626 452 9009 Alternate 626 482 3066 Fax 626 452 9010 Email info calimetco com www calimetco com...

Отзывы: