![Calimet CM7-ACFP Скачать руководство пользователя страница 15](http://html1.mh-extra.com/html/calimet/cm7-acfp/cm7-acfp_instruction-manual_3450221015.webp)
Figure 20
Slave operator activation
Figure 21
1. Set SLAVE switch on SLAVE CONTROL BOARD to ON position.
2.
Use UL proved electric wire connect DATA- and DATA- from Master control board to Slave
control Board, then connect DATA+ and DATA+ accordingly.
3. M/LINK light turns to solid bright.
14
Features
External Receiver
External connectors are installed on the rear side of mainboard protector box.