6 Zone
T-STAT 2
C
R
W
T
T COM
COMMS
D
P
DHW
ZR/ZC
X X
T-STAT 3
C
R
W
T
T COM
T-STAT 1
C
R
W
T
T COM
L
PUMP 2
N
PRIMARY
PUMP
L
PRIORITY
PUMP 1
N
L
POWER IN
N
GROUNDS
L
PUMP 3
N
TRANSFORMER
L
N
T-STAT 4
C
R
W
T
T COM
L
PUMP 4
N
L
PUMP 5
N
L
PUMP 6
N
T-STAT 5
C
R
W
T
T COM
T-STAT 6
C
R
W
T
T COM
PWR
ZONE1
ZONE2
ZONE3
ZONE4
ZONE5
ZONE6
DipSwitches
Master
Slave
Priority OFF
Priority ON
Primary OFF
Primary ON
Exercise OFF
Exercise ON
Post Purge OFF
Post Purge ON
ZSR106
When a zone has a demand from a thermostat (T T or R W) the control will send 24 VAC to the
corresponding zone valve. When the zone valve end switch closes, the primary pump will switch
on and the (X X) dry contacts will close to signal the boiler of a heating demand. Zone 1 can be
used for priority (either a priority pump or valve). When the priority jumper is ON, a demand from
T-Stat1 will activate 24VAC to valve 1 and the priority pump will switch on after the end switch
closes (requires a jumper in the end switch terminals if a valve is not used). The DHW (ZR/ZC)
dry contact will also close. Depending upon "Status During Priority" jumper, the system pump will
either be ON or OFF.
The jumpers on the ZVR series can be positioned for the
following operations.
Priority ON / Priority OFF:
When priority jumper is ON, upon
demand, zone 1 will operate as priority and all other zones are
temporarily switched off (with 1 hour time-out). When priority
mode is OFF, any zones that were active when zone 1 was
switched on will remain on.
Status During Priority ON / Status During Priority OFF:
When
status jumper is ON, the system pump will continue to operate
during priority.
Master / Slave:
allows for unlimited expansion to additional ZVR
relays.
6 Zone
ZVR106
L
POWER IN
N
PWR
TSAT1 ZONE1
TSAT2 ZONE2
TSAT3 ZONE3
TSAT4 ZONE4
TSAT5 ZONE5
TSAT6 ZONE6
L
PRIORITY
PUMP
N
L
SEC PUMP
N
STATUS
DURING
PRIORITY
ZONE 1
END
SWITCH
MOTOR
PRIORITY
ZONE 2
END
SWITCH
MOTOR
ZONE 3
END
SWITCH
MOTOR
ZONE 4
END
SWITCH
MOTOR
ZONE 5
END
SWITCH
MOTOR
ZONE 6
END
SWITCH
MOTOR
ON OFF
ON OFF
L
SYSTEM
PUMP
N
MASTER SLAVE
T-STAT 2
C
R
W
T
T COM
COMMS
D
P
DHW
ZR/ZC
X X
T-STAT 3
C
R
W
T
T COM
T-STAT 1
C
R
W
T
T COM
T-STAT 4
C
R
W
T
T COM
T-STAT 5
C
R
W
T
T COM
T-STAT 6
C
R
W
T
T COM
Large screw terminals connections makes wiring easy with three pump screw terminal connections.
Pump terminals connection have 120 VAC outputs for simplified pump connections. Zone valve
connections can be 2, 3 or 4 wire.
Z-oneLink unlimited expansion allows adding addition ZVR
series relay controls to a Master ZVR. Communication is
accomplished by connecting three wires (bell or thermostat
wire) to the communication terminals located in the upper
right hand corner. The jumper is positioned to Master / Slave
position. A demand for heat from any zone will fire the boiler
and start the pump.
6 Zone
ZVR106
L
POWER IN
N
PWR
TSAT1 ZONE1
TSAT2 ZONE2
TSAT3 ZONE3
TSAT4 ZONE4
TSAT5 ZONE5
TSAT6 ZONE6
L
PRIORITY
PUMP
N
L
SEC PUMP
N
STATUS
DURING
PRIORITY
ZONE 1
END
SWITCH
MOTOR
PRIORITY
ZONE 2
END
SWITCH
MOTOR
ZONE 3
END
SWITCH
MOTOR
ZONE 4
END
SWITCH
MOTOR
ZONE 5
END
SWITCH
MOTOR
ZONE 6
END
SWITCH
MOTOR
ON OFF
ON OFF
L
SYSTEM
PUMP
N
MASTER SLAVE
T-STAT 2
C
R
W
T
T COM
COMMS
D
P
DHW
ZR/ZC
X X
T-STAT 3
C
R
W
T
T COM
T-STAT 1
C
R
W
T
T COM
T-STAT 4
C
R
W
T
T COM
T-STAT 5
C
R
W
T
T COM
T-STAT 6
C
R
W
T
T COM
6 Zone
ZVR106
L
POWER IN
N
PWR
TSAT1 ZONE1
TSAT2 ZONE2
TSAT3 ZONE3
TSAT4 ZONE4
TSAT5 ZONE5
TSAT6 ZONE6
L
PRIORITY
PUMP
N
L
SEC PUMP
N
STATUS
DURING
PRIORITY
ZONE 1
END
SWITCH
MOTOR
PRIORITY
ZONE 2
END
SWITCH
MOTOR
ZONE 3
END
SWITCH
MOTOR
ZONE 4
END
SWITCH
MOTOR
ZONE 5
END
SWITCH
MOTOR
ZONE 6
END
SWITCH
MOTOR
ON OFF
ON OFF
L
SYSTEM
PUMP
N
MASTER SLAVE
T-STAT 2
C
R
W
T
T COM
COMMS
D
P
DHW
ZR/ZC
X X
T-STAT 3
C
R
W
T
T COM
T-STAT 1
C
R
W
T
T COM
T-STAT 4
C
R
W
T
T COM
T-STAT 5
C
R
W
T
T COM
T-STAT 6
C
R
W
T
T COM
6 Zone
ZVR106
L
POWER IN
N
PWR
TSAT1 ZONE1
TSAT2 ZONE2
TSAT3 ZONE3
TSAT4 ZONE4
TSAT5 ZONE5
TSAT6 ZONE6
L
PRIORITY
PUMP
N
L
SEC PUMP
N
STATUS
DURING
PRIORITY
ZONE 1
END
SWITCH
MOTOR
PRIORITY
ZONE 2
END
SWITCH
MOTOR
ZONE 3
END
SWITCH
MOTOR
ZONE 4
END
SWITCH
MOTOR
ZONE 5
END
SWITCH
MOTOR
ZONE 6
END
SWITCH
MOTOR
ON OFF
ON OFF
L
SYSTEM
PUMP
N
MASTER SLAVE
T-STAT 2
C
R
W
T
T COM
COMMS
D
P
DHW
ZR/ZC
X X
T-STAT 3
C
R
W
T
T COM
T-STAT 1
C
R
W
T
T COM
T-STAT 4
C
R
W
T
T COM
T-STAT 5
C
R
W
T
T COM
T-STAT 6
C
R
W
T
T COM
6 Zone
T-STAT 2
C
R
W
T
T COM
COMMS
D
P
DHW
ZR/ZC
X X
T-STAT 3
C
R
W
T
T COM
T-STAT 1
C
R
W
T
T COM
L
PUMP 2
N
PRIMARY
PUMP
L
PRIORITY
PUMP 1
N
L
POWER IN
N
GROUNDS
L
PUMP 3
N
TRANSFORMER
L
N
T-STAT 4
C
R
W
T
T COM
L
PUMP 4
N
L
PUMP 5
N
L
PUMP 6
N
T-STAT 5
C
R
W
T
T COM
T-STAT 6
C
R
W
T
T COM
PWR
ZONE1
ZONE2
ZONE3
ZONE4
ZONE5
ZONE6
DipSwitches
Master
Slave
Priority OFF
Priority ON
Primary OFF
Primary ON
Exercise OFF
Exercise ON
Post Purge OFF
Post Purge ON
ZSR106
Jumper set up
Wiring terminals