background image

17

Sequence of Operation / Settings

Priority switch: OFF

Master / Slave switch: Master

Status During Priority switch: OFF

• 

A demand occurs from any T-stat (T-stat 

closes  TT  terminals).  The  “PUMP  ON”  LED 

illuminates for that zone.

• 

ZSR control sends 120 VAC to the 

corresponding zone pump and the primary 

pump outputs, XX contacts close to signal 

boiler of a demand.

• 

When the demand from the last T-stat calling 

is satisfied (T-stat opens TT terminals), the XX 

contacts  are  opened,  the  “PUMP  ON”  LED 

turns off and the 120 VAC to the zone pump 

and primary pump outputs are dropped.

Description of terminals

= Ground

= Neutral (Common leg of 120 VAC)

= Line (Hot leg of 120 VAC)

Thermostat terminals

R         = 24 VAC
W        = Heat call
C        = Common of 24 VAC

Boiler terminals

XX = Dry contacts rated up to 120 VAC, 2 Amps.  

Closes when any zone calls including priority. 

Typically connected to TT on boiler control.
DHW (ZR/ZC) = Dry contacts rated up to 120 VAC, 

2 Amps.  Closes only when priority is enabled and 

calling. Typically used to close ZR\ZC (120 VAC) 

or DHW contacts (24 VAC) on boiler controls 

equipped with these features.

Dip switch description

Master / Slave: Used when joining 2 or more 

controls together.  Only one Master per group
Priority OFF / Priority ON: Used to set Zone #1 

as the priority zone.  All other zones will hold off 

during priority.  Priority has a one hour time out 

feature to prevent freeze up.
Primary OFF / Primary ON: Sets the status of the 

primary pump when there is a priority call. This 

allows the DHW pump to be on either side of a 

hydro separator.
Exercise OFF / Exercise ON: When enabled the 

pumps will rub for 30 seconds after 72 hours 

without a demand.
Post Purge OFF / Post Purge ON: Allows the DHW 

pump to run for 2 minutes after the DHW demand 

has been satisfied. 

WARNING: 

NEVER CONNECT R & C DIRECTLY, 

this will be a direct short on the 24 VAC supply

Содержание Z-one ZVR10 Series

Страница 1: ...of switching line voltage Large terminal connections High Capacity 40 VA Transformer standard for 3 and 4 zone models expandable to 80 VA and 80 VA for the 6 zone model Automatic resettable fuse Cont...

Страница 2: ...th the electrical wiring diagram and in accordance with national and local electrical codes WARNING Avoid electrical noise interference Do not install near large conductors electrical machinery or wel...

Страница 3: ...es no maintenance If control fails or is damaged replace control with functional one Mounting Mount the Caleffi Z one switching relay box to a suitable surface Slotted holes are provided for mounting...

Страница 4: ...nsformer s from packaging Slide bottom end of transformer into bottom latch Snap top of transformer into latch arms Feed wiring through hole near the top of the transformer and insert transformer plug...

Страница 5: ...ion to additional ZVR relays L POWER IN N L PRIORITY PUMP N L SEC PUMP N STATUS DURING PRIORITY ZONE 1 END SWITCH MOTOR PRIORITY ZONE 2 END SWITCH MOTOR ON OFF ON OFF L SYSTEM PUMP N Large screw termi...

Страница 6: ...ORITY PUMP N L SEC PUMP N STATUS DURING PRIORITY ZONE 1 END SWITCH MOTOR PRIORITY ZONE 2 END SWITCH MOTOR ZONE 3 END SWITCH MOTOR ZONE 4 END SWITCH MOTOR ZONE 5 END SWITCH MOTOR ZONE 6 END SWITCH MOTO...

Страница 7: ...N L SEC PUMP N SYSTEM PUMP STATUS DURING PRIORITY ZONE 1 END SWITCH MOTOR PRIORITY ZONE 2 END SWITCH MOTOR ZONE 3 END SWITCH MOTOR ZONE 4 END SWITCH MOTOR ZONE 5 END SWITCH MOTOR ZONE 6 END SWITCH MO...

Страница 8: ...SWITCH MOTOR ON OFF ON OFF L SYSTEM PUMP N MASTER SLAVE L N A pump SYSTEM pump A4 A3 A2 A5 A6 B pump 6 Zone ZVR106 T STAT 2 C R W T T COM COMMS D P DHW ZR ZC X X T STAT 3 C R W T T COM T STAT 1 C R W...

Страница 9: ...along with a primary pump can be operated Zone priority is selectable with 1 hour time out feature Other features include pump exercising selectable post purge and 3 pump ground terminals for simpli...

Страница 10: ...20 ZVR103 ZVR104 ZVR106 multi zone valve control Product overview 22 Circuit board 23 Cover removal Transformer Installation 24 Product details 25 C1 Mod Con boiler hydro separator zone valves 26 C2 M...

Страница 11: ...UMP 5 N L PUMP 6 N THM 5 C R W T T COM THM 6 C R W T T COM PWR ZONE1 ZONE2 ZONE3 ZONE4 ZONE5 ZONE6 DipSwitches Master Slave Priority OFF Priority ON Primary OFF Primary ON Exercise OFF Exercise ON Pos...

Страница 12: ...0 VAC pump with boiler enable or two devices without boiler enable 5 A capacity each relay 10 A total Rear knock outs for mounting onto 4 x4 junction box High capacity 6VA transformer Simpli ed wiring...

Страница 13: ...p connection Dual labeled T stat terminals Compatible with 2 3 and 4 wire T stats Replaceable fuses 6 VA Transformer Keyhole mounting which fits a 4X4 junction box Pre installed jumper Rear knockout f...

Страница 14: ...om power zone transformer N L L RELAY 1 C N O N C C N O N C RELAY 2 Calef single zone relay L N A1 Single thermostat Hydronic diagram is for illustration purposes only some components have been remove...

Страница 15: ...ied and opens RW TT The relay contacts return to their normal position common to normally closed The zone LED turns off Description of terminals Ground N Neutral Common leg of 120 VAC L Line live leg...

Страница 16: ...N C C N O N C RELAY 2 Calef single zone relay 4 wire zone valve 4 wire zone valve 4 wire zone valve R W 24 VAC T T R W R W End switch wires L N A2 Multiple thermostats Hydronic diagram is for illustr...

Страница 17: ...LED illuminates When the last of the T stats is satisfied the corresponding zone valves closes which opens the end switch contacts The relay contacts return to their normal position turning off power...

Страница 18: ...V R W C T T com power zone transformer N L L RELAY 1 C N O N C C N O N C RELAY 2 Calef single zone relay T T L N A3 Single master thermostat panel radiators with TRVs variable speed pump Hydronic diag...

Страница 19: ...side air reset curve As long as the master thermostat is calling the boiler will maintain the buffer tank to the target temperature The thermostatic radiator valves modulate the flow through the panel...

Страница 20: ...ure Selectable post purge and exercise Dry contacts for DHW ZR ZC capable of switching line voltage High capacity transformer Large terminal connections Simplified wiring with extra ground terminals H...

Страница 21: ...ions to expansion board Power ON LED Dual labeled T stat terminals Compatible with 2 3 and 4 wire T stats DHW ZR ZC closes only during priority call Rated for 120 VAC 2 amps Selectable DIP switches XX...

Страница 22: ...release from base Roll cover off base Mounting Do not mount to a surface that exceeds 115 F 45 C The unit must be only located in dry interior locations Use only copper conductor supply wire suitable...

Страница 23: ...M T STAT 6 C R W T T COM PWR ZONE1 ZONE2 ZONE3 ZONE4 ZONE5 ZONE6 DipSwitches Master Slave Priority OFF Priority ON Primary OFF Primary ON Exercise OFF Exercise ON Post Purge OFF Post Purge ON ZSR106 Z...

Страница 24: ...P 6 N T STAT 5 C R W T T COM T STAT 6 C R W T T COM PWR ZONE1 ZONE2 ZONE3 ZONE4 ZONE5 ZONE6 DipSwitches Master Slave Priority OFF Priority ON Primary OFF Primary ON Exercise OFF Exercise ON Post Purge...

Страница 25: ...ing priority Typically connected to TT on boiler control DHW ZR ZC Dry contacts rated up to 120 VAC 2 Amps Closes only when priority is enabled and calling Typically used to close ZR ZC 120 VAC or DHW...

Страница 26: ...R W T T COM PWR ZONE1 ZONE2 ZONE3 ZONE4 ZONE5 ZONE6 DipSwitches Master Slave Priority OFF Priority ON Primary OFF Primary ON Exercise OFF Exercise ON Post Purge OFF Post Purge ON DHW aquastat T T ZR...

Страница 27: ...ll of the zone pumps DHW Time Out Freeze Prevention Feature After one hour of a priority demand the control will open the DHW contacts and turn off power to the DHW pump If a heating demand is present...

Страница 28: ...N T STAT 5 C R W T T COM T STAT 6 C R W T T COM PWR ZONE1 ZONE2 ZONE3 ZONE4 ZONE5 ZONE6 DipSwitches Master Slave Priority OFF Priority ON Primary OFF Primary ON Exercise OFF Exercise ON Post Purge OFF...

Страница 29: ...C 2 Amps Closes when any zone calls including priority Typically connected to TT on boiler control DHW ZR ZC Dry contacts rated up to 120 VAC 2 Amps Closes only when priority is enabled and calling Ty...

Страница 30: ...contacts for DHW ZR ZC capable of switching line voltage Large terminal connections High capacity 40 VA transformer standard for 3 and 4 zone models expandable to 80 VA and 80 VA for the 6 zone model...

Страница 31: ...wire communications to expansion board Power ON LED Dual labeled T stat terminals Compatible with 2 3 and 4 wire T stats DHW ZR ZC closes only during priority call Rated for 120 VAC 2 amps Master Sla...

Страница 32: ...ttom latch Snap top of transformer into latch arms Feed wiring through hole near the top of the transformer and insert transformer plug into the socket Repeat process for 2nd transformer if using six...

Страница 33: ...C R W T T COM D DHW ZR ZC X X T STAT 3 C R W T T COM T STAT 1 C R W T T COM T STAT 4 C R W T T COM T STAT 5 C R W T T COM T STAT 6 C R W T T COM 6 Zone ZVR106 PWR TSAT1 ZONE1 TSAT2 ZONE2 TSAT3 ZONE3 T...

Страница 34: ...RIORITY PUMP N L SEC PUMP N STATUS DURING PRIORITY ZONE 1 END SWITCH MOTOR PRIORITY ZONE 2 END SWITCH MOTOR ZONE 3 END SWITCH MOTOR ZONE 4 END SWITCH MOTOR ZONE 5 END SWITCH MOTOR ZONE 6 END SWITCH MO...

Страница 35: ...0 VAC L Line live leg of 120 VAC Thermostat terminals R 24 VAC W Heat call C Common of 24 VAC Boiler terminals XX Dry contacts rated up to 120 VAC 2 Amps Closes when any zone calls including priority...

Страница 36: ...Y ZONE 2 END SWITCH MOTOR ZONE 3 END SWITCH MOTOR ZONE 4 END SWITCH MOTOR ZONE 5 END SWITCH MOTOR ZONE 6 END SWITCH MOTOR ON OFF ON OFF L SYSTEM PUMP N MASTER SLAVE L N PRIORITY pump SECONDARY pump ZV...

Страница 37: ...AT CALL LED s illuminate When the zone valve end switch closes the VALVE OPEN LED illuminates the XX contacts close the SEC PUMP and SYSTEM PUMP terminals deliver 120 VAC DHW Time Out Freeze Preventio...

Страница 38: ...RIORITY ZONE 1 END SWITCH MOTOR PRIORITY ZONE 2 END SWITCH MOTOR ZONE 3 END SWITCH MOTOR ZONE 4 END SWITCH MOTOR ZONE 5 END SWITCH MOTOR ZONE 6 END SWITCH MOTOR ON OFF ON OFF L SYSTEM PUMP N MASTER SL...

Страница 39: ...T STAT CALL LED s illuminate When the zone valve end switch closes the VALVE OPEN LED illuminates the XX contacts close the SEC PUMP and SYSTEM PUMP terminals deliver 120 VAC DHW Time Out Freeze Prev...

Страница 40: ...2 C R W T T COM COMMS D P DHW ZR ZC X X T STAT 3 C R W T T COM T STAT 1 C R W T T COM L POWER IN N T STAT 4 C R W T T COM T STAT 5 C R W T T COM T STAT 6 C R W T T COM PWR TSAT1 ZONE1 TSAT2 ZONE2 TSA...

Страница 41: ...acts deliver 120 VAC The SEC PUMP and SYSTEM PUMP are off Once the Zone 1 DHW demand is satisfied power to the PRIORITY PUMP is dropped the DHW contacts open If a demand from zones 2 thru 12 is presen...

Страница 42: ...PUMP N L SEC PUMP N SYSTEM PUMP STATUS DURING PRIORITY ZONE 1 END SWITCH MOTOR PRIORITY ZONE 2 END SWITCH MOTOR ZONE 3 END SWITCH MOTOR ZONE 4 END SWITCH MOTOR ZONE 5 END SWITCH MOTOR ZONE 6 END SWIT...

Страница 43: ...tral common leg of 120 VAC L Line live leg of 120 VAC Thermostat terminals R 24 VAC W Heat call C Common of 24 VAC Boiler terminals XX Dry contacts rated up to 120 VAC 2 Amps Closes when any zone call...

Страница 44: ...SEC PUMP N SYSTEM PUMP STATUS DURING PRIORITY ZONE 1 END SWITCH MOTOR PRIORITY ZONE 2 END SWITCH MOTOR ZONE 3 END SWITCH MOTOR ZONE 4 END SWITCH MOTOR ZONE 5 END SWITCH MOTOR ZONE 6 END SWITCH MOTOR M...

Страница 45: ...STAT CALL LED s illuminate When the zone valve end switch closes the VALVE OPEN LED illuminates the XX contacts close the SEC PUMP and SYSTEM PUMP terminals deliver 120 VAC DHW Time Out Freeze Prevent...

Страница 46: ...X T STAT 3 C R W T T COM T STAT 1 C R W T T COM L POWER IN N T STAT 4 C R W T T COM T STAT 5 C R W T T COM T STAT 6 C R W T T COM PWR TSAT1 ZONE1 TSAT2 ZONE2 TSAT3 ZONE3 TSAT4 ZONE4 TSAT5 ZONE5 TSAT6...

Страница 47: ...e MOTOR terminals If no other zones are calling power is turned off to the SEC PUMP and SYSTEM PUMP and the XX contacts are opened Description of terminals Ground N Neutral common leg of 120 VAC L Lin...

Страница 48: ...40 Caleffi North America Inc 3883 W Milwaukee Rd Milwaukee WI 53208 Tel 414 238 2360 Fax 44 238 2366 www caleffi com usa sales caleffi com Copyright 2014 Caleffi North America Inc...

Отзывы: