Inspection
Inspect packages for damage. If damaged, notify the appropriate carrier
immediately. If undamaged, open the package and inspect the device for
obvious damage. Return damaged products.
•
Use only copper conductor supply wire suitable for at least 105° C
•
All circuits must have a common disconnect and be connected to the
same pole of the disconnect
Maintenance and Repair
The Caleffi Z-one
™
multi-zone valve control comes with a resettable
fuse and requires no maintenance. If control fails or is damaged, replace
control with functional one.
Mounting
Mount the Caleffi Z-one
™
switching relay box to a suitable surface.
Slotted holes are provided for mounting purposes. Do not mount to a
surface that exceeds 115°F (45°C). The unit must be only located in dry
interior locations. It is not suitable for installation in hazardous locations
and should not be placed close to any electromagnetic fields.
Installation
Cover removal
Hold either the left or the right
end of the box up and at an
angle. Use body for stabilizing
relay box.
Insert screwdriver and push tab
inward, cover should release from
base.
Roll cover off base.